5.6 Six-Rack Cabling for X8M Racks

This section provides the cabling tables to connect six (6) X8M racks together, all of which use RoCE Network Fabric.

Note:

The following conventions were used in the cabling notation for connecting multiple racks together.

  • The spine switch (also referred to as SS) is in U1 for all racks.

  • The leaf switches are referred to as Lower Leaf (LL) and Upper Leaf (UL).

  • The leaf switches are located as follows:

    • At rack unit 20 (U20) and 22 (U22) in Oracle Exadata X8M-2 or Storage Expansion Rack X8M-2

    • At rack unit 21 (U21) and rack unit 23 (U23) in Oracle Exadata X8M-8

  • The cable lengths shown in the following lists assume that the racks are adjacent to each other, the cables are routed through a raised floor, and there are no obstacles in the routing between the racks. If the racks are not adjacent, or use overhead cabling trays, then they may require longer cable lengths. Cable lengths up to 100 meters are supported.

  • Only optical cables (with additional transceivers) are supported for lengths greater than 5 meters.

  • For X8M-8 systems with three database servers and 11 storage servers only, you must adjust the following multi-rack cabling information. On such systems only, port 30 on the leaf switches is connected to a database server and is not used as an inter-switch link. Consequently, in the following tables, any connection to port number 30 on any leaf switch must instead connect to port number 34 on the same leaf switch. For example, R1-UL-P30 must change to R1-UL-P34, R1-LL-P30 must change to R1-LL-P34, and so on. These changes only apply to X8M-8 systems with three database servers and 11 storage servers.

The following illustration shows the cable connections for the 6 spine switches when cabling six racks together:



The following table describes the cable connections for the first spine switch (R1-SS) when cabling six racks together:

Table 5-15 Leaf Switch Connections for the First Rack in a Six-Rack System

Leaf Switch Connection Cable Length

R1 UL within Rack 1

R1-UL-P5 to R1-SS-P5

R1-UL-P7 to R1-SS-P7

3 meters

R1 UL to Rack 2

R1-UL-P31 to R2-SS-P5

R1-UL-P33 to R2-SS-P7

5 meters

R1 UL to Rack 3

R1-UL-P6 to R3-SS-P5

5 meters

R1 UL to Rack 4

R1-UL-P4 to R4-SS-P5

10 meters

R1 UL to Rack 5

R1-UL-P30 to R5-SS-P5

10 meters

R1 UL to Rack 6

R1-UL-P32 to R6-SS-P5

10 meters

R1 LL within Rack 1

R1-LL-P5 to R1-SS-P13

3 meters

R1 LL to Rack 2

R1-LL-P31 to R2-SS-P13

R1-LL-P33 to R2-SS-P15

5 meters

R1 LL to Rack 3

R1-LL-P4 to R3-SS-P13

R1-LL-P6 to R3-SS-P15

5 meters

R1 LL to Rack 4

R1-LL-P30 to R4-SS-P13

10 meters

R1 LL to Rack 5

R1-LL-P7 to R5-SS-P13

10 meters

R1 LL to Rack 6

R1-LL-P32 to R6-SS-P13

10 meters

The following table describes the cable connections for the second spine switch (R2-SS) when cabling six full racks together:

Table 5-16 Leaf Switch Connections for the Second Rack in a Six-Rack System

Leaf Switch Connection Cable Length

R2 UL to Rack 1

R2-UL-P5 to R1-SS-P6

5 meters

R2 UL within Rack 2

R2-UL-P31 to R2-SS-P6

3 meters

R2 UL to Rack 3

R2-UL-P6 to R3-SS-P6

R2-UL-P30 to R3-SS-P8

5 meters

R2 UL to Rack 4

R2-UL-P4 to R4-SS-P6

R2-UL-P32 to R4-SS-P8

5 meters

R2 UL to Rack 5

R2-UL-P7 to R5-SS-P6

10 meters

R2 UL to Rack 6

R2-UL-P33 to R6-SS-P6

10 meters

R2 LL to Rack 1

R2-LL-P5 to R1-SS-P14

5 meters

R2 LL within Rack 2

R2-LL-P31 to R2-SS-P14

3 meters

R2 LL to Rack 3

R2-LL-P6 to R3-SS-P14

5 meters

R2 LL to Rack 4

R2-LL-P4 to R4-SS-P14

R2-LL-P30 to R4-SS-P16

5 meters

R2 LL to Rack 5

R2-LL-P33 to R5-SS-P14

R2-LL-P32 to R5-SS-P16

10 meters

R2 LL to Rack 6

R2-LL-P7 to R6-SS-P14

10 meters

The following table describes the cable connections for the third spine switch (R3-SS) when cabling six full racks together:

Table 5-17 Leaf Switch Connections for the Third Rack in a Six-Rack System

Leaf Switch Connection Cable Length

R3 UL to Rack 1

R3-UL-P5 to R1-SS-P11

5 meters

R3 UL to Rack 2

R3-UL-P6 to R2-SS-P11

5 meters

R3 UL within Rack 3

R3-UL-P30 to R3-SS-P11

3 meters

R3 UL to Rack 4

R3-UL-P4 to R4-SS-P11

5 meters

R3 UL to Rack 5

R3-UL-P32 to R5-SS-P11

R3-UL-P33 to R5-SS-P12

5 meters

R3 UL to Rack 6

R3-UL-P7 to R6-SS-P11

R3-UL-P31 to R6-SS-P12

10 meters

R3 LL to Rack 1

R3-LL-P7 to R1-SS-P19

R3-LL-P4 to R1-SS-P20

5 meters

R3 LL to Rack 2

R3-LL-P31 to R2-SS-P20

5 meters

R3 LL within Rack 3

R3-LL-P32 to R3-SS-P20

3 meters

R3 LL to Rack 4

R3-LL-P33 to R4-SS-P20

5 meters

R3 LL to Rack 5

R3-LL-P5 to R5-SS-P20

5 meters

R3 LL to Rack 6

R3-LL-P6 to R6-SS-P19

R3-LL-P30 to R6-SS-P20

10 meters

The following table describes the cable connections for the fourth spine switch (R4-SS) when cabling six full racks together:

Table 5-18 Leaf Switch Connections for the Fourth Rack in a Six-Rack System

Leaf Switch Connection Cable Length

R4 UL to Rack 1

R4-UL-P7 to R1-SS-P10

10 meters

R4 UL to Rack 2

R4-UL-P4 to R2-SS-P9

R4-UL-P6 to R2-SS-P10

5 meters

R4 UL to Rack 3

R4-UL-P31 to R3-SS-P9

R4-UL-P33 to R3-SS-P10

5 meters

R4 UL within Rack 4

R4-UL-P32 to R4-SS-P10

3 meters

R4 UL to Rack 5

R4-UL-P5 to R5-SS-P10

5 meters

R4 UL to Rack 6

R4-UL-P30 to R6-SS-P10

5 meters

R4 LL to Rack 1

R4-LL-P5 to R1-SS-P17

10 meters

R4 LL to Rack 2

R4-LL-P4 to R2-SS-P17

5 meters

R4 LL to Rack 3

R4-LL-P31 to R3-SS-P17

R4-LL-P33 to R3-SS-P18

5 meters

R4 LL within Rack 4

R4-LL-P30 to R4-SS-P17

R4-LL-P32 to R4-SS-P18

3 meters

R4 LL to Rack 5

R4-LL-P7 to R5-SS-P17

5 meters

R4 LL to Rack 6

R4-LL-P6 to R6-SS-P17

5 meters

The following table describes the cable connections for the fifth spine switch (R5-SS) when cabling six full racks together:

Table 5-19 Leaf Switch Connections for the Fifth Rack in a Six-Rack System

Leaf Switch Connection Cable Length

R5 UL to Rack 1

R5-UL-P5 to R1-SS-P8

10 meters

R5 UL to Rack 2

R5-UL-P4 to R2-SS-P8

10 meters

R5 UL to Rack 3

R5-UL-P6 to R3-SS-P12

5 meters

R5 UL to Rack 4

R5-UL-P31 to R4-SS-P7

R5-UL-P33 to R4-SS-P12

5 meters

R5 UL within Rack 5

R5-UL-P30 to R5-SS-P7

R5-UL-P32 to R5-SS-P9

3 meters

R5 UL to Rack 6

R5-UL-P7 to R6-SS-P7

5 meters

R5 LL to Rack 1

R5-LL-P7 to R1-SS-P18

10 meters

R5 LL to Rack 2

R5-LL-P6 to R2-SS-P18

10 meters

R5 LL to Rack 3

R5-LL-P31 to R3-SS-P16

5 meters

R5 LL to Rack 4

R5-LL-P33 to R4-SS-P19

5 meters

R5 LL within Rack 5

R5-LL-P30 to R5-SS-P15

R5-LL-P32 to R5-SS-P19

3 meters

R5 LL to Rack 6

R5-LL-P5 to R6-SS-P9

R5-LL-P4 to R6-SS-P15

5 meters

The following table describes the cable connections for the sixth spine switch (R6-SS) when cabling six full racks together:

Table 5-20 Leaf Switch Connections for the Sixth Rack in a Six-Rack System

Leaf Switch Connection Cable Length

R6 UL to Rack 1

R6-UL-P5 to R1-SS-P9

R6-UL-P7 to R1-SS-P16

10 meters

R6 UL to Rack 2

R6-UL-P4 to R2-SS-P16

10 meters

R6 UL to Rack 3

R6-UL-P6 to R3-SS-P19

10 meters

R6 UL to Rack 4

R6-UL-P31 to R4-SS-P15

5 meters

R6 UL to Rack 5

R6-UL-P33 to R5-SS-P18

5 meters

R6 UL within Rack 6

R6-UL-P30 to R6-SS-P16

R6-UL-P32 to R6-SS-P18

3 meters

R6 LL to Rack 1

R6-LL-P5 to R1-SS-P12

R6-LL-P7 to R1-SS-P15

10 meters

R6 LL to Rack 2

R6-LL-P4 to R2-SS-P12

R6-LL-P6 to R2-SS-P19

10 meters

R6 LL to Rack 3

R6-LL-P31 to R3-SS-P7

10 meters

R6 LL to Rack 4

R6-LL-P33 to R4-SS-P9

5 meters

R6 LL to Rack 5

R6-LL-P30 to R5-SS-P8

5 meters

R6 LL within Rack 6

R6-LL-P32 to R6-SS-P8

3 meters