Three-Phase Power Distribution Unit Cabling Connections RA23

Table 18-4 shows the cable connections from the power distribution units (PDUs) to the rack units in an Oracle Zero Data Loss Recovery Appliance RA23 full rack. The destinations and the cable lengths are the same in racks with fewer storage servers. The cables terminate at PDU-A on the left and are routed to the right to enter the cable management arm (CMA). The cables are bundled in groups of four.

Table 17-4 Three-Phase PDU Cabling for the Recovery Appliance RA23 Full Racks

Rack Unit(1) PDU-A & PSU0 PDU-B & PSU1 Cable Length
U42 G4-1 G1-5 3 meters
U41 G3-1 G0-5 3 meters
U40 G5-4 G2-2 3 meters
U39 G1-4 G4-2 3 meters
U37 G2-1 G5-5 3 meters
U35 G0-4 G3-2 3 meters
U33 G2-2 G5-4 3 meters
U31 G1-2 G4-4 3 meters
U29 G0-1 G3-5 3 meters
U27 G2-0 G5-6 3 meters
U26 G5-1 G2-5 3 meters
U25 G1-1 G4-5 3 meters
U23 G0-2 G3-4 3 meters
U22* G1-6 G4-0 2 meters
U21* G2-6 G5-0 2 meters
U20* G1-5 G4-1 2 meters
U19 G3-6 G0-0 3 meters
U18 G4-2 G1-4 3 meters
U16* G1-3 G4-3 3 meters
U14* G0-5 G3-1 3 meters
U12 G2-5 G5-1 3 meters
U10 G0-3 G3-3 3 meters
U8 G2-3 G5-3 3 meters
U6* G2-4 G5-2 3 meters
U4* G0-6 G3-0 3 meters
U2* G0-0 G3-6 3 meters
U1* G1-0 G4-6 3 meters

Footnote 1 Un is the unit location in the rack, where n is the number.