Database Error Messages

CRS-07512

There is a delay or more than 'number' milliseconds in reading the received messages. Additional Diagnostics: number of messages delayed 'number''

Cause

The reason for this issue was one of the following:

  • The Oracle Grid Infrastructure process was not scheduled by the operating system in a timely manner.
  • The system was heavily loaded.
  • The Oracle Grid Infrastructure process did not handle the Grid Interprocess Communication (GIPC) events in a timely manner.

Action

(a) Reduce the load on the system or add a new node to the existing cluster, if the system is heavily loaded. (b) Check if the process is busy in handling other requests.