PCC-02469
        Must use option PLAN_BASELINE along with option PLAN_ENABLED
        
        
        Cause
        Parameter required for Plan Baseline creation (PLAN_ENABLED) was used without specifying the option PLAN_BASELINE=[<module_name>/yes].
        Action
        Specify the option PLAN_BASELINE=[<module_name>/yes].
        
     
    
    