PCC-02470
Must use option PLAN_BASELINE along with option PLAN_FIXED
Cause
Parameter required for Plan Baseline creation (PLAN_FIXED) was used without specifying PLAN_BASELINE=[<module_name>/yes].
Action
Specify the option PLAN_BASELINE=[<module_name>/yes].
PCC-02470
Must use option PLAN_BASELINE along with option PLAN_FIXED
Cause
Parameter required for Plan Baseline creation (PLAN_FIXED) was used without specifying PLAN_BASELINE=[<module_name>/yes].
Action
Specify the option PLAN_BASELINE=[<module_name>/yes].
PCC-02470
Must use option PLAN_BASELINE along with option PLAN_FIXED
Cause
Parameter required for Plan Baseline creation (PLAN_FIXED) was used without specifying PLAN_BASELINE=[<module_name>/yes].
Action
Specify the option PLAN_BASELINE=[<module_name>/yes].