Database Error Messages

Release
toggle
  • 23ai
  • 21c
  • 19c
Updated
Jun 24, 2024

PRCN-03017

Specified check interval of {0} minutes exceeds the maximum check interval {1} minutes

Cause

The Configuration Verification Utility (CVU) resource check interval specified was more than the maximum check interval.


Action

Retry the operation with an interval smaller than or equal to the maximum check interval.