Hardware Installation and Maintenance Guide System Installation Cabinet-Style 4-Post Chassis Installation Installing the Stationary Slides Front-Mounting a Square Hole Rack Installation Front-Mounting a Square Hole Rack Installation To install the stationary slide rails on the front of a square hole equipment rack: Locate the following components: 2 x stationary slide rail sections 4 x 10-32 x 5/8” screws 2 x mounting spacers 2 x nut bars Line up the stationary slide rail end with three mounting slots with an appropriate mount point on the front of the equipment rack. Front Mount Point Place 2 x 10-32 screws through the mounting spacer, through the stationary slide rail ear, through the square rack slide rail. Hold the nut bar behind the front rack slide rail. Secure the 10-32 screw to the nut bar you are holding in place. Refer to the following exploded view of procedure: Screwing In and Securing the Stationary Slide Rail Do not completely torque the screws; leave a small amount of play at this point. Repeat Steps 3 - 5 for the other mounting point. Stationary Slide Rain Secured to Front Mount Point Repeat this procedure for the other stationary slide.