2 Disaster Recovery Impacted Area

The following table describes scenarios about the impacted areas during CNC Console disaster recovery:

Table 2-1 Disaster Recovery Scenarios Impact Information

Scenario Requires Disaster Recovery or re-install of CNE? Requires Disaster Recovery or re-install of cnDBTier? Requires Disaster Recovery or re-install of CNC Console? Comments
Scenario 1: Complete Site Failure Yes Yes Yes  
Scenario 2: cnDBTier Corruption No Yes No DBTier must be restored from backup. Re-install of CnDBTier can be considered, if restoring from backup is not possible. Use helm upgrade if DB configuration is changed
Scenario 3: Console Configuration Database Corruption No No No Backup and restore of configuration database is required on the impacted site. This needs periodic backup. (Applicable for M-CNCC IAM)
Scenario 4: Deployment Failure No No Yes CNC Console DB is not restored. Only helm uninstall/install is done. (Applicable for M-CNCC IAM, M-CNCC Core and A-CNCC Core)
Scenario 5: NF Instance Failure No No Yes The NF endpoints must be updated in the custom values.yaml file and helm upgrade must be performed to incorporate the latest endpoints (Applicable at M-CNCC Core and A-CNCC Core).