Order Lifecycle Policy Editor Grace Periods Tab

Use the Order Lifecycle Policy Editor Grace Periods tab to specify a period of time that the system should wait before suspending, amending, or canceling an order.

A grace period specifies a period of time to wait for all accepted tasks to complete before transitioning an order. You can specify a grace period for the Suspend Order, Process Amendment, and Cancel Order transactions. Grace periods are defined by a wait duration and an event frequency.

Field Use

Wait Duration

Select Indefinitely (the default setting) or specify a time frame using the minimum and maximum times that the system waits before forcing the transition.

Event Frequency

Specify the frequency at which the system should generate a jeopardy notification (defined as every hour, by default) while the wait duration remains unsatisfied.