1 Introduction
Purpose and Scope
This document describes Oracle’s recommended methods and procedures to be used to evaluate Site and STP data retrieved from in-service EAGLE STP. This document is intended for use for system running EAGLE releases 45.0 or later as well as system being upgrade to those releases. The intended audience for this document is EAGLE® Engineering, Documentation, Customer Service personnel and any craft person who has completed EAGLE training and is familiar with the EAGLE interface. The scope of this document is specifically to collect data to determine the health of an in-service EAGLE prior to a software upgrade or an extension shelf installation. In general, this document may be used for an instance where the health determination of the EAGLE is required (i.e., troubleshooting).
This document should be considered the next volume to 909-0656-001; see reference [2]. The former document covers EAGLE releases 31.6 to 44.0, where this document starts at release 45.0 and will continue for future releases. The initial content of this document is equivalent to the last version of that previous document with the additions of updates to support EAGLE Release 45.0. In release 45.0, the legacy GPSM/TDM hardware is no longer supported as the MASP, so this document does not have to support both hardware setup and removes complexity of several steps that had to support both platforms.
The document is written to support all customer configurations. All of the commands specified in the procedures should be executed unless explicitly stated otherwise in the individual procedure. Not doing so may result in a delay in the analysis performed by Oracle personnel.
Analysis of data captured during this procedure is out of the scope of this document. Analysis of the data is covered in Health Check Analysis Work Instruction, WI005139, latest revision, Tekelec.
References
- Health Check Analysis Work Instruction, WI005139, latest revision, Tekelec
- EAGLE 5 ISS Releases 31.6 and later System Healthcheck Document, 909-0656-001,Revision P, Version 7.2, Tekelec
- TEKELEC Acronym Guide, MS005077.doc, current revision
- Recommended Ethernet Port Settings for EAGLE SM Cards and EPAP Switch Ports, KM Alert Doc 2275062.1, current revision
Acronyms
Table 1-1 Acronyms
Acronym | Definition |
---|---|
AST | Associate State for Maintenance |
BITS | Building Integrated Timing System |
DPC | Destination Point Code |
DSM | Database Services Module |
E5-OAM | EAGLE Operation, Admission, & Maintenance |
E5-MASP | Dual-card HW assembly composed of E5-MCAP and E5-TDM |
FOA | First Office Application |
GPL | Generic Program Load |
IMT | Interprocessor Message Transport |
IS-ANR | In Service - Abnormal |
IS-NR | In Service - Normal |
KSR terminal | Keyboard Send Receive terminal |
Legacy MASP | System using GPSM-II\TDM card set (obsolete in release 45.0) |
MASP | Maintenance and Administration Subsystem Processor |
MCP | Measurements Collector/Poller |
PST | Primary State for Maintenance |
SAK | Software Access Key |
SCCP | Signaling Connection Control Part |
SLIC | Service and Link Interface Card |
UHC | Upgrade Health Check |
For additional Acronyms, refer to TEKELEC Acronym Guide, MS005077.doc, current revision.