1.1 Purpose and Scope
This document is designed to detail the steps necessary for full upgrade of the ELAP 10.2.x to ELAP 11.1.x on the E5APP-B-01/02 cards.
This work is intended to be non-intrusive to the signaling network traffic and is to be performed within the limits of a normally scheduled maintenance window unless otherwise stated.
It will be necessary to halt the provisioning activity during the execution of the procedures outlined herein while a full database backup is being taken. Normal provisioning can resume once the Full upgrade has completed. For any issues incurred in executing any part of this document, follow the contact/escalation list.
The individual executing this procedure must be experienced and well proficient with the following platforms and technologies.:
-
Unix/Linux Admin
-
VI Editor
-
IP Networking
If you do not have these skills or if you are not completely comfortable working in a Unix or Linux system environment
