Network Deployment Options
Before getting started, it is important to determine how the D6000 will be deployed.
Note:
When considering deployment options, please note that the bypass pairs will default to Fail-To-Block until configured otherwise.Example instructions for some of the most common deployment scenarios are provided below:
Router (Gateway, Fail to Block)
The D6000 is deployed as the WAN gateway for the site, and bypass pair is configured as Fail-To-Block. Use this option if you plan to use the Talari Appliance as the edge device for the site.
Layer 2 Fail-To-Wire (Overlay)
The D6000 is deployed on the LAN side of the gateway, and bypass pair is configured as Fail-To-Wire. Use this option if you prefer to retain existing edge devices or plan to install an alternative edge device on the WAN side of the Talari Appliance.
MPLS & Internet Hybrid
The D6000 is deployed as an overlay for MPLS while performing routing/firewall capabilities for internet links. Use this option if recommended by your Sales Architect, or if you have an MPLS/Internet hybrid network and will not be using the CE Router Replacement functionality of Oracle SD-WAN Edge.
Other Options
There are other deployment options, and our Talari Implementation team members will assist you with planning and deploying your new appliance.