P6 - Activity / Primavera Activity

Description: Use this subject area to analyze project, WBS, and activity level details. This subject area includes earned value metrics and percent complete metrics, planned and actual units and hours, and project baseline comparisons.

Folder Subfolder Field Name Dimension/ Fact / Lookup Description Values Derived From / Calculated By
Project Budget - (Project) Current Budget Dimension The Current Budget is the sum of the Original Budget and all approved budget changes in the Budget Change Log. Value Derived From : Dim_W_PROJECT_D_Project.CURRENT_BUDGET
Project Budget - (Project) Current Variance Dimension The difference between the current budget and the total spending plan. This value is not rolled up. Calculated as Current Budget minus Total Spending Plan. Value Derived From : Dim_W_PROJECT_D_Project.CURRENT_VARIANCE
Project Budget - (Project) Distributed Current Budget Dimension The sum of all budgets that were assigned to control accounts during baseline planning. These budgets are allocated for work and planning packages. Calculated as the sum of the Current Budget values from one level lower. Not rolled up. Value Derived From : Dim_W_PROJECT_D_Project.DISTRIBUTED_CURRENT_BUDGET
Project Budget - (Project) Original Budget Dimension The estimate of the total amount you require for the selected project, including all contributed funds. Value Derived From : Dim_W_PROJECT_D_Project.ORIGINAL_BUDGET
Project Budget - (Project) Proposed Budget Dimension The proposed budget for the project. Calculated as Original Budget plus the sum of the Approved and Pending Budgets from the budget log. Value Derived From : Dim_W_PROJECT_D_Project.PROPOSED_BUDGET
Project Budget - (Project) Total Benefit Plan Dimension Sum of the Monthly Benefit Plan. Not rolled up. Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_BENEFIT_PLAN
Project Budget - (Project) Total Benefit Plan Tally Dimension Sum of the Monthly Benefit Plan Tally. Not rolled up. Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_BENEFIT_PLAN_TALLY
Project Budget - (Project) Total Funding Dimension The total amount of funding contributed to the project by your funding sources. Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_FUNDING
Project Budget - (Project) Total Spending Plan Dimension Sum of the Monthly Spending Plan. Not rolled up. Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_SPENDING_PLAN
Project Budget - (Project) Total Spending Plan Tally Dimension Sum of the Monthly Spending Plan Tally. Not rolled up. Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_SPENDING_PLAN_TALLY
Project Budget - (Project) Unallocated Budget Dimension Calculated as Total Current Budget - Distributed Current Budget. Value Derived From : Dim_W_PROJECT_D_Project.UNALLOCATED_BUDGET
Project Budget - (Project) Undistributed Current Variance Dimension Computed as the Total Spending Plan minus the Total Spending Plan Tally. Not rolled up. Value Derived From : Dim_W_PROJECT_D_Project.UNDISTRIBUTED_CURRENT_VARIANCE
Project Dates - (Project) Actual Finish Date Dimension Actual Finish Date Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_FINISH_DATE
Project Dates - (Project) Actual Start Date Dimension Actual Start Date Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_START_DATE
Project Dates - (Project) Anticipated Finish Dimension Anticipated finish date of WBS, Project and EPS elements. User-entered - not dependent upon any other fields. If there are no children, the anticipated finish date will be the Finish date displayed in the columns. Value Derived From : Dim_W_PROJECT_D_Project.ANTICIPATED_FINISH_DATE
Project Dates - (Project) Anticipated Start Dimension Anticipated start date of WBS, Project and EPS elements. User-entered - not dependent upon any other fields. If there are no children, the anticipated start date will be the Start date displayed in the columns. Value Derived From : Dim_W_PROJECT_D_Project.ANTICIPATED_START_DATE
Project Dates - (Project) Baseline Finish Date Dimension Baseline Finish Date Value Derived From : Dim_W_PROJECT_D_Project.BASELINE_FINISH_DATE
Project Dates - (Project) Baseline Start Date Dimension Baseline Start Date Value Derived From : Dim_W_PROJECT_D_Project.BASELINE_START_DATE
Project Dates - (Project) Data Date Dimension The current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied. Value Derived From : Dim_W_PROJECT_D_Project.DATA_DATE
Project Dates - (Project) Date Added Dimension The date this project was added Value Derived From : Dim_W_PROJECT_D_Project.ADD_DATE
Project Dates - (Project) Finish Dimension The current finish date of the project. For not started and in-progress projects, this is the latest early finish date from all activities in the project. For completed projects, this is the latest actual finish date derived from all activities. For projects with no activities, the Finish Date is equal to the Anticipated Finish date if one is defined. For projects with no activities and no Anticipated Finish date, the Finish Date field is blank. Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_FINISH_DATE
Project Dates - (Project) Forecast Finish Date Dimension The end date optionally used by the project scheduler Value Derived From : Dim_W_PROJECT_D_Project.FORECAST_FINISH_DATE
Project Dates - (Project) Forecast Start Date Dimension The start date optionally used by the project scheduler Value Derived From : Dim_W_PROJECT_D_Project.FORECAST_START_DATE
Project Dates - (Project) Must Finish By Dimension The optional date constraint you can specify for the project end date Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_PLANNED_FINISH_DATE
Project Dates - (Project) Planned Finish Dimension The date the project is scheduled to start Value Derived From : Dim_W_PROJECT_D_Project.PLANNED_FINISH_DATE
Project Dates - (Project) Planned Start Dimension The date the project is scheduled to start Value Derived From : Dim_W_PROJECT_D_Project.PLANNED_START_DATE
Project Dates - (Project) Scheduled Finish Dimension The calculated latest early finish date, which is based on the schedule most recently generated for the project. Value Derived From : Dim_W_PROJECT_D_Project.SCHEDULED_FINISH_DATE
Project Dates - (Project) Start Dimension The current start date of the project. For a not started project, this is the project's planned start date. For a project that has started or is complete, this is the project's actual start date. For projects with no activities, the start date is equal to the anticipated start date if one is defined; if no anticipated start is defined, then the start date is equal to the project's planned start date. Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_START_DATE
Project Durations - (Project) Actual Duration Dimension Actual duration is the total time from the project actual start date to the actual finish date (for completed projects), or to the current data date (for in-progress projects). Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_DURATION
Project Durations - (Project) At Completion Duration Dimension The duration at completion is the total time from the project current start date to the current finish date. Value Derived From : Dim_W_PROJECT_D_Project.AT_COMPLETION_DURATION
Project Durations - (Project) Baseline Project Duration Dimension The duration of the baseline project. Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_DURATION
Project Durations - (Project) Planned Duration Dimension Planned duration is the total time from the project planned start date to the planned finish date. Value Derived From : Dim_W_PROJECT_D_Project.PLANNED_DURATION
Project Durations - (Project) Remaining Duration Dimension Remaining duration is the total time from the current data date to the current finish date. Value Derived From : Dim_W_PROJECT_D_Project.REMAINING_DURATION
Project Durations - (Project) Variance - Baseline Project Duration Dimension The duration between the baseline project duration and the current project duration. Calculated as Planned Duration minus At Completion Duration. Value Derived From : Dim_W_PROJECT_D_Project.DURATION_VARIANCE
Project Durations - (Project) Variance - Baseline Project Finish Date Dimension Variance - Baseline Project Finish Date Value Derived From : Dim_W_PROJECT_D_Project.FINISH_DATE_VARIANCE
Project General - (Project) Added By Dimension The name of the user who added the project Value Derived From : Dim_W_PROJECT_D_Project.ADDED_BY_NAME
Project General - (Project) Datasource Id Dimension A unique source Id created for the Primavera data source being used. Used to identify data sources when using multiple Primavera data sources. Value Derived From : Dim_W_PROJECT_D_Project.DATASOURCE_ID
Project General - (Project) Datasource Type Lookup Datasource Type LOOKUP(DENSE "P6Core"."Lookup - ETL Source Type"."Feature Desc", "P6Core"."Dim - Project"."Datasource Id")
Project General - (Project) Project Leveling Priority Dimension Priority for leveling Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_PRIORITY
Project General - (Project) Project Score Dimension The Project score Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_SCORE
Project General - (Project) Project Description Dimension The project description Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_DESCRIPTION
Project General - (Project) Project Id Dimension The Project Id of the project Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_ID
Project General - (Project) Project Name Dimension The project name Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_NAME
Project General - (Project) Unique Project ID Dimension The Unique ID of the project Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_OBJECT_ID
Project General - (Project) Project Owner Dimension Resource designated as owner of the project Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_OWNER
Project General - (Project) Project Risk Exposure Dimension The calculated exposure value for the risk Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_EXPOSURE
Project General - (Project) Project Risk Level Dimension Project risk level (1 - Very Low, 2 - Low, 3 - Medium, 4 - High, 5 - Very High) Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_LEVEL
Project General - (Project) Project Risk Score Dimension The calculated score value of the impact values assigned to the risk Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_SCORE
Project General - (Project) Unique Project WBS ID Dimension The Unique ID of the projects root level WBS Value Derived From : Dim_W_PROJECT_D_Project.WBS_OBJECT_ID
Project General - (Project) Project Status Dimension The status of the project as active, inactive, planned or what-if Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_STATUS
Project General - (Project) Strategic Priority Dimension Range 1 to 10,000 Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_STRATEGIC_PRIORITY
Project Location - (Project) Address Line 1 Dimension The first line of the address Value Derived From : Dim_W_PROJECT_D_Project.ADDRESS_LINE1
Project Location - (Project) Address Line 2 Dimension The second line of the address Value Derived From : Dim_W_PROJECT_D_Project.ADDRESS_LINE2
Project Location - (Project) City Name Dimension The city name for this Location Value Derived From : Dim_W_PROJECT_D_Project.CITY_NAME
Project Location - (Project) Country Code Dimension The country code for this Location Value Derived From : Dim_W_PROJECT_D_Project.COUNTRY_CODE
Project Location - (Project) Country Name Dimension The country name for this Location Value Derived From : Dim_W_PROJECT_D_Project.COUNTRY_NAME
Project Location - (Project) Latitude Dimension The latitude for this Location Value Derived From : Dim_W_PROJECT_D_Project.LATITUDE
Project Location - (Project) Location Name Dimension The name of the location Value Derived From : Dim_W_PROJECT_D_Project.LOCATION_NAME
Project Location - (Project) Location Type Dimension Location Type Value Derived From : Dim_W_PROJECT_D_Project.LOCATION_TYPE
Project Location - (Project) Longitude Dimension The longitude for this Location Value Derived From : Dim_W_PROJECT_D_Project.LONGITUDE
Project Location - (Project) Municipality Name Dimension The municipality name for this Location Value Derived From : Dim_W_PROJECT_D_Project.MUNICIPALITY_NAME
Project Location - (Project) Postal Code Dimension The postal code for this Location Value Derived From : Dim_W_PROJECT_D_Project.POSTAL_CODE
Project Location - (Project) State/Province Code Dimension The state abbreviation for this Location Value Derived From : Dim_W_PROJECT_D_Project.STATE_CODE
Project Location - (Project) State/Province Name Dimension The state name for this Location Value Derived From : Dim_W_PROJECT_D_Project.STATE_NAME
Project P6 Links     Go to P6 Links  
Project P6 Links Link to Activities Dimension Go to Project Activities '<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Dactivities">' || 'Project Activities' || '</a>'
Project P6 Links Link to Documents Dimension Go to Project Documents '<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Ddocuments">' || 'Project Documents' || '</a>'
Project P6 Links Link to Issues Dimension Go to Project Issues '<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || '/action/pm/lwfissuemanagement?projectId=' || CAST (P6Core."Dim - Project"."Project Object Id" AS VARCHAR ( 10 )) || '&wbsId=' || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '&checkTabs=true">' || 'Project Issues' || '</a>'
Project P6 Links Link to Risks Dimension Go to Project Risks '<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Drisks">' || 'Project Risks' || '</a>'
Project Notebooks - (Project) Link to Team Usage Dimension Go to Project Team Usage '<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Dteamusage">' || 'Project Team Usage' || '</a>'
Project Notebooks - (Project) Create Date Dimension The date the notebook topic was created Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_CREATE_DT
Project Notebooks - (Project) Create User Dimension The user that created the notebook topic Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_CREATE_USER
Project Notebooks - (Project) Notebook Text Lookup The text of the notebook topic Lookup(DENSE "P6Core"."Lookup - Project Note"."Raw Text", "P6Core"."Dim - Project Note"."Note Key", "P6Core"."Dim - Project Note"."Project Key")
Project Notebooks - (Project) Notebook Topic Name Dimension The name of the notebook topic Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.NOTEBOOK_TOPIC_NAME
Project Notebooks - (Project) Update Date Dimension The date the notebook topic was updated Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_UPDATE_DT
Project Notebooks - (Project) Update User Dimension The last user to update notebook topic Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_UPDATE_USER
           
Cost Breakdown Structure Folder          
Cost Breakdown Structure General - (CBS) CBS Code Dimension The full cost code Value Derived From : Dim_W_CBS_HIERARCHY_D_CbsHier.CBS_CODE
Cost Breakdown Structure General - (CBS) CBS Name Dimension The name of the CBS element Value Derived From : Dim_W_CBS_HIERARCHY_D_CbsHier.CBS_NAME
Cost Breakdown Structure General - (CBS) Cost Status Dimension The status of the cost code Value Derived From : Dim_W_CBS_HIERARCHY_D_CbsHier.CBS_STATUS
           
Time Folder          
Time Calendar Calendar Date Dimension Calendar Date (01/01/2013 12:00am) Value Derived From : Dim_W_DAY_D_Common.DAY_DT
Time Calendar Calendar Half Dimension Calendar Half (1-2) Value Derived From : Dim_W_DAY_D_Common.CAL_HALF
Time Calendar Calendar Month Dimension Calendar Month (1-12) Value Derived From : Dim_W_DAY_D_Common.CAL_MONTH
Time Calendar Calendar Quarter Dimension Calendar Quarter (1-4) Value Derived From : Dim_W_DAY_D_Common.CAL_QTR
Time Calendar Calendar Week Dimension Calendar Week (1-53) Value Derived From : Dim_W_DAY_D_Common.CAL_WEEK
Time Calendar Calendar Year Dimension Calendar Year (2013) Value Derived From : Dim_W_DAY_D_Common.CAL_YEAR
Time Calendar Day Date Dimension Calendar Date (01/01/2013 12:00am) Value Derived From : Dim_W_DAY_D_Common.DAY_DT
Time Calendar Day Name Dimension Full day name (January 1, 2013) Value Derived From : Dim_W_DAY_D_Common.DAY_NAME
Time Calendar Day Of Month Dimension Day of the month (1 - 31) Value Derived From : Dim_W_DAY_D_Common.DAY_OF_MONTH
Time Calendar Day Of Week Dimension Day of the week (1=Sunday, 7=Saturday) Value Derived From : Dim_W_DAY_D_Common.DAY_OF_WEEK
Time Calendar Day Of Year Dimension Day of the year (1-365) Value Derived From : Dim_W_DAY_D_Common."DAY_OF_YEAR"
Time Calendar Financial Period Dimension Financial Period (2013-01-01) Value Derived From : Dim_W_DAY_D_Common.FIN_PERIOD_1
Time Calendar Short Day Name Dimension Day-Month (01-JAN) Value Derived From : Dim_W_DAY_D_Common.SHORT_DAY_NAME
Time Calendar Half Name Dimension Year-Half name (2013-H1) Value Derived From : Dim_W_DAY_D_Common.SORT_HALF_NAME
Time Calendar Month Name Dimension Year-Month name (2013-01) Value Derived From : Dim_W_DAY_D_Common.SORT_MONTH_NAME
Time Calendar Quarter Name Dimension Year-Quarter name (2013-Q4) Value Derived From : Dim_W_DAY_D_Common.SORT_QUARTER_NAME
Time Calendar Week Name Dimension First day of the week (2013-01-01) Value Derived From : Dim_W_DAY_D_Common.SORT_WEEK_NAME
Time Calendar Year Name Dimension Year Name (2013) Value Derived From : Dim_W_DAY_D_Common.YEAR_NAME
           
Fact - Primavera -Activity Folder          
Fact - Primavera -Activity Costs Actual Expense Cost Fact The actual cost for all project expenses associated with the activity Value calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_EXPENSE_COST)
Fact - Primavera -Activity Costs Actual Labor Cost Fact The actual cost for all labor resources assigned to the activity. If no resources are assigned, computed as the activity Actual Labor Units * Project Default Price / Time. Value calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_LABOR_COST)
Fact - Primavera -Activity Costs Actual Material Cost Fact The actual cost for all material resources assigned to the activity Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_MATERIAL_COST)
Fact - Primavera -Activity Costs Actual NonLabor Cost Fact The actual cost for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity Actual Nonlabor Units * Project Default Price / Time. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_NONLABOR_COST)
Fact - Primavera -Activity Costs Actual Total Cost Fact The Actual Total Cost for the activity, including labor resources, nonlabor resources, material resources, and project expenses. Actual Total Cost = Actual Labor Cost + Actual Nonlabor Cost + Actual Material Cost + Actual Expense Cost. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_TOTAL_COST)
Fact - Primavera -Activity Costs At Completion Expense Cost Fact The expense cost at completion is the sum of the actual plus remaining cost for all expenses associated with the activity. Computed as Actual Expense Cost + Remaining Expense Cost. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_EXPENSE_COST)
Fact - Primavera -Activity Costs At Completion Labor Cost Fact The labor cost at completion is the sum of the actual plus remaining cost for all labor resources assigned to the activity. Computed as Actual Labor Cost + Remaining Labor Cost. Same as the budgeted labor cost if the activity is not started and the actual labor cost once the activity is completed. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_LABOR_COST)
Fact - Primavera -Activity Costs At Completion Material Cost Fact The material cost at completion is the sum of the actual plus remaining cost for all material resources assigned to the activity. Computed as Actual Material Cost + Remaining Material Cost. Same as the budgeted material cost if the activity is not started and the actual material cost once the activity is completed. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_MATERIAL_COST)
Fact - Primavera -Activity Costs At Completion Nonlabor Cost Fact The nonlabor cost at completion is the sum of the actual plus remaining cost for all nonlabor resources assigned to the activity. Computed as Actual Nonlabor Cost + Remaining Nonlabor Cost. Same as the budgeted nonlabor cost if the activity is not started and the actual nonlabor cost once the activity is completed. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_NONLABOR_COST)
Fact - Primavera -Activity Costs At Completion Total Cost Fact The total cost at completion for the activity, including labor resources, nonlabor resources, material resources, and project expenses. At Completion Total Cost = At Completion Labor Cost + At Completion Nonlabor Cost + At Completion Material Cost + At Completion Expense Cost. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_TOTAL_COST)
Fact - Primavera -Activity Costs Baseline Actual Expense Cost Fact The actual cost for all project expenses associated with the activity in the primary baseline Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_EXPENSE_COST)
Fact - Primavera -Activity Costs Baseline Actual Labor Cost Fact The actual cost for all labor resources assigned to the activity in the project baseline. If no resources are assigned, computed as the activity Baseline Project Actual Labor Units * Project Default Price / Time. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_LABOR_COST)
Fact - Primavera -Activity Costs Baseline Actual Material Cost Fact The actual cost for all material resources assigned to the activity in the project baseline Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_MATERIAL_COST)
Fact - Primavera -Activity Costs Baseline Actual Nonlabor Cost Fact The actual cost for all nonlabor resources assigned to the activity in the project baseline. If no resources are assigned, computed as the activity Baseline Project Actual Nonlabor Units * Project Default Price / Time Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_NONLABOR_COST)
Fact - Primavera -Activity Costs Baseline Actual Total Cost Fact The actual total cost for the activity in the project baseline, including labor resources, nonlabor resources, material resources and project expenses. Baseline Project Actual Total Cost = Baseline Project Actual Labor Cost + Baseline Project Actual Nonlabor Cost + Baseline Project Actual Material Cost + Baseline Project Actual Expense Cost Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_TOTAL_COST)
Fact - Primavera -Activity Costs Baseline Project Expense Cost Fact The cost for all the project expenses associated with the activity in the project baseline. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_EXPENSE_COST)
Fact - Primavera -Activity Costs Baseline Project Labor Cost Fact The cost for all the labor resources assigned to an activity in the project baseline. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_LABOR_COST)
Fact - Primavera -Activity Costs Baseline Project Material Cost Fact Budgeted or (At Completion)cost for all material resources assigned to the activity in the project baseline. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_MATERIAL_COST)
Fact - Primavera -Activity Costs Baseline Project Nonlabor Cost Fact The cost for all the Nonlabor resources assigned to an activity in the project baseline Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_NONLABOR_COST)
Fact - Primavera -Activity Costs Baseline Project Total Cost Fact The total cost of the activity in the project baseline, including labor resources, non-labor resources, material resources, and project expenses. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_TOTAL_COST)
Fact - Primavera -Activity Costs Planned Expense Cost Fact The budgeted cost for all project expenses associated with the activity. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_EXPENSE_COST)
Fact - Primavera -Activity Costs Planned Labor Cost Fact The budgeted costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity Budgeted Labor Units * Project Default Price / Time. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_LABOR_COST)
Fact - Primavera -Activity Costs Planned Material Cost Fact The budgeted costs for all material resources assigned to the activity. If no resources are assigned, computed as the activity Budgeted Labor Units * Project Default Price / Time. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_MATERIAL_COST)
Fact - Primavera -Activity Costs Planned Nonlabor Cost Fact The budgeted costs for all nonlabor resources assigned to the activity. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_NONLABOR_COST)
Fact - Primavera -Activity Costs Planned Total Cost Fact The budgeted total cost for the activity, including labor resources, nonlabor resources, material resources, and project expenses. Budgeted Total Cost = Budgeted Labor Cost + Budgeted Nonlabor Cost + Budgeted Material Cost + Budgeted Expense Cost. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_TOTAL_COST)
Fact - Primavera -Activity Costs Remaining Expense Cost Fact The remaining cost for all project expenses associated with the activity. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_EXPENSE_COST)
Fact - Primavera -Activity Costs Remaining Labor Cost Fact The remaining cost for all labor resources assigned to the activity. If no resources are assigned, computed as the activity Remaining Labor Units * Project Default Price / Time. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LABOR_COST)
Fact - Primavera -Activity Costs Remaining Late Expense Cost Fact Remaining Late Expense Cost Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_EXPENSE_COST)
Fact - Primavera -Activity Costs Remaining Late Labor Cost Fact Remaining Late Labor Cost Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_LABOR_COST)
Fact - Primavera -Activity Costs Remaining Late Material Cost Fact Remaining Late Material Cost Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_MATERIAL_COST)
Fact - Primavera -Activity Costs Remaining Late Nonlabor Cost Fact Remaining Late Nonlabor Cost Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_NONLABOR_COST)
Fact - Primavera -Activity Costs Period Remaining Late Total Cost Fact The Remaining Late Total Cost for the period specified Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_TOTAL_COST)
Fact - Primavera -Activity Costs Remaining Material Cost Fact The remaining cost for all material resources assigned to the activity. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_MATERIAL_COST)
Fact - Primavera -Activity Costs Remaining Nonlabor Cost Fact The remaining cost for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity Remaining Nonlabor Units * Project Default Price / Time. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_NONLABOR_COST)
Fact - Primavera -Activity Costs Remaining Total Cost Fact The remaining total cost for the activity, including labor resources, nonlabor resources, material resources, and project expenses. Remaining Total Cost = Remaining Labor Cost + Remaining Nonlabor Cost + Remaining Material Cost + Remaining Expense Cost. Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_TOTAL_COST)
Fact - Primavera -Activity Earned Value (Cost) Accounting Variance (Cost) Fact Accounting Variance is the Planned Value minus the Actual Cost. A negative value indicates that Actual Cost have exceeded the Planned Value Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Planned Value Cost" - "P6Core"."Fact - Activity Spread"."Actual Cost"
Fact - Primavera -Activity Earned Value (Cost) Budget At Completion (Cost) Fact Budget at Completion is the baseline Labor Cost + baseline Nonlabor Cost + baseline Expense Cost + baseline Material Cost. Same as the baseline Total Cost. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Baseline Project Total Cost"
Fact - Primavera -Activity Earned Value (Cost) Cost Performance Index (Cost) Fact Cost Performance Index is the Earned Value divided by the Actual Cost. A value less than 1 indicates that Actual Cost have exceeded the Planned Value. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" / "P6Core"."Fact - Activity Spread"."Actual Cost"
Fact - Primavera -Activity Earned Value (Cost) Cost Schedule Index (Cost) Fact Cost Schedule Index By Cost Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Performance Index - (CPI)" * "P6Core"."Fact - Activity Spread"."Schedule Performance Index (SPI) - Cost"
Fact - Primavera -Activity Earned Value (Cost) Cost Variance (Cost) Fact Cost Variance is the Earned Value minus the Actual Cost. A negative value indicates that Actual Cost have exceeded the Planned Value. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" - "P6Core"."Fact - Activity Spread"."Actual Cos
Fact - Primavera -Activity Earned Value (Cost) Cost Variance Index (Cost) Fact Cost Variance Index is the Cost Variance divided by Earned Value. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Variance" / "P6Core"."Fact - Activity Spread"."Earned Value Cost"
Fact - Primavera -Activity Earned Value (Cost) Earned Value (Cost) Fact Earned value cost for the project Value Derived From: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EARNED_VALUE_COST)
Fact - Primavera -Activity Earned Value (Cost) Estimate At Completion (Cost) Fact Estimate Cost at Completion is the Actual Cost plus the Estimate to Complete Cost. The method for computing Estimate to Complete depends on the Earned Value technique selected for the activity's WBS. Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_AT_COMPLETION_COST)
Fact - Primavera -Activity Earned Value (Cost) Estimate to Complete (Cost) Fact Calculated Estimate To Complete using specified technique Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_TO_COMPLETE_COST)
Fact - Primavera -Activity Earned Value (Cost) Planned Value (Cost) Fact Planned cost of work scheduled for the project Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_VALUE_COST)
Fact - Primavera -Activity Earned Value (Cost) Schedule Performance Index (Cost) Fact Schedule Performance Index is the Earned Value divided by Planned Value. A value less than 1 indicates that less work was actually performed than was scheduled. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" / "P6Core"."Fact - Activity Spread"."Planned Value Cost"
Fact - Primavera -Activity Earned Value (Cost) Schedule Variance (Cost) Fact Schedule Variance is the Earned Value minus the Planned Value. A negative value indicates that less work was actually performed than was scheduled. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" - "P6Core"."Fact - Activity Spread"."Planned Value Cost"
Fact - Primavera -Activity Earned Value (Cost) Schedule Variance Index (Cost) Fact Schedule Variance Index is the Schedule Variance divided by Planned Value. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Schedule Variance - Cost" / "P6Core"."Fact - Activity Spread"."Planned Value Cost"
Fact - Primavera -Activity Earned Value (Cost) To Complete Performance Index - BAC (Cost) Fact The To Complete Performance Index is (Budget at Completion - Earned Value) / (Budget at Completion (BAC)- Actual Cost). Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Earned Value Cost") / ("P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Actual Cost")
Fact - Primavera -Activity Earned Value (Cost) To Complete Performance Index - EAC (Cost) Fact The To Complete Performance Index is (Budget at Completion - Earned Value) / (Estimate at Completion - Actual Cost). Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Earned Value Cost") / ("P6Core"."Fact - Activity Spread"."Estimate At Completion Cost" - "P6Core"."Fact - Activity Spread"."Actual Cost")
Fact - Primavera -Activity Earned Value (Cost) Variance At Completion (Cost) Fact Variance At Completion is the Budget At Completion (baseline total cost) minus Estimate At Completion. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Estimate At Completion Cost"
Fact - Primavera -Activity Earned Value (Units) Accounting Variance (Units) Fact Accounting Variance Labor Units is the Planned Value Labor Units minus the Actual Units. Negative value indicates that Actual Units have exceeded the Planned Value Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Planned Value Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units"
Fact - Primavera -Activity Earned Value (Units) Budget At Completion (Units) Fact Budget at Completion Labor Units is the baseline Labor Units + baseline Nonlabor Labor Units + baseline Expense Labor Units + baseline Material Labor Units. Same as the baseline Total Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Baseline Project Labor Units"
Fact - Primavera -Activity Earned Value (Units) Cost Performance Index (Units) Fact Cost Performance Index Labor Units is the Earned Value Labor Units / Actual Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" / "P6Core"."Fact - Activity Spread"."Actual Labor Units"
Fact - Primavera -Activity Earned Value (Units) Cost Schedule Index (Units) Fact Cost Schedule Index By Units Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Performance Index (CPI) - Labor Units" * "P6Core"."Fact - Activity Spread"."Schedule Performance Index (SPI) - Labor Units"
Fact - Primavera -Activity Earned Value (Units) Cost Variance (Units) Fact Cost Variance Labor Units is Earned Value Labor Units minus Actual Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units"
Fact - Primavera -Activity Earned Value (Units) Cost Variance Index (Units) Fact Cost Variance Index is the Cost Variance divided by Earned Value. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Variance - Labor Units" / "P6Core"."Fact - Activity Spread"."Earned Value Labor Units"
Fact - Primavera -Activity Earned Value (Units) Earned Value (Units) Fact Earned Value Labor Units Performed is the portion of the baseline Labor Units that is actually completed as of the project data date. Computed as baseline Labor Units * Performance % Complete. The Earned Value Labor Units is essentially the labor units earned value for the activity. The method for computing the Performance % Complete depends on the earned value technique selected for the activity's WBS. The baseline Labor Units is taken from the baseline. Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EARNED_VALUE_LABOR_UNITS)
Fact - Primavera -Activity Earned Value (Units) Estimate At Completion (Units) Fact Estimate At Completion Labor Units is calculated as Actual Labor Units + Estimate To Complete Labor Units. (Estimate To Complete Labor Units is calculated based off of the Earned Value setting on the WBS.) Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_AT_COMPLETION_LABOR_UNITS)
Fact - Primavera -Activity Earned Value (Units) Estimate To Complete (Units) Fact The estimated quantity to complete of the activity. Computed as either the remaining total units for the activity, or as Performance Factor * (Baseline Budgeted Labor Units - Budgeted Quantity of Work Performed), depending on the Earned Value Technique selected for the activity's WBS. Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_TO_COMPLETE_LABOR_UNITS)
Fact - Primavera -Activity Earned Value (Units) Planned Value (Units) Fact Planned Value Labor Units Scheduled is the portion of the baseline Labor Units that is scheduled to be completed as of the project data date. For activities without resource assignments, and for activity resource assignments that do not have resource curves, computed as baseline Labor Units * Schedule % Complete. For activity resource assignments that do have resource curves, the curve distribution is additionally factored into the calculation. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. The baseline Labor Units is taken from the baseline. Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_VALUE_LABOR_UNITS)
Fact - Primavera -Activity Earned Value (Units) Schedule Performance Index (Units) Fact Schedule Performance Index Labor Units is the Earned Value Labor Units divided by Planned Value Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" / "P6Core"."Fact - Activity Spread"."Planned Value Labor Units"
Fact - Primavera -Activity Earned Value (Units) Schedule Variance (Units) Fact Schedule Variance Labor Units is the Earned Value Labor Units minus Planned Value Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" - "P6Core"."Fact - Activity Spread"."Planned Value Labor Units"
Fact - Primavera -Activity Earned Value (Units) Schedule Variance Index (Units) Fact Schedule Variance Index is the Schedule Variance Labor Units divided by the Planned Value Labor Units. Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Schedule Variance - Labor Units" / "P6Core"."Fact - Activity Spread"."Planned Value Labor Units"
Fact - Primavera -Activity Earned Value (Units) To Complete Performance Index - BAC (Units) Fact The To Complete Performance Index is (Budget at Completion (BAC) - Earned Value Labor Units) / (Budget at Completion (BAC) - Actual Labor Units). Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units" - "P6Core"."Fact - Activity Spread"."Earned Value Labor Units") / ("P6Core"."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units")
Fact - Primavera -Activity Earned Value (Units) To Complete Performance Index - EAC (Units) Fact The To Complete Performance Index is (Budget at Completion (EAC) - Earned Value Labor Units) / (Estimated at Completion - Actual Labor Units). Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units" - "P6Core"."Fact - Activity Spread"."Earned Value Labor Units") / ("P6Core"."Fact - Activity Spread"."Estimate At Completion - Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units")
Fact - Primavera -Activity Earned Value (Units) Variance At Completion (Units) Fact Variance At Completion is the Planned Labor Units minus Estimate At Completion Labor Units. "P6Core"."Fact - Activity Spread"."Baseline Project Labor Units" - "P6Core"."Fact - Activity Spread"."Estimate At Completion - Labor Units"
Fact - Primavera - Activity Metrics # Of Activities Fact # Of Activities Value Derived From: count(distinct case when Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTIVITY_WID > 0 then Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTIVITY_WID else NULL end )
Fact - Primavera -Activity Metrics # Of Projects Fact # Of Projects Value Derived From: count(distinct Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PROJECT_WID)
Fact - Primavera - Activity Percent Completes        
Fact - Primavera - Activity Percent Completes Cost % Complete Fact The percent complete of cost for all labor resources, nonlabor resources, material resources, and expenses for the activity. Computed as Actual Total Cost / At Completion Total Cost * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Total Cost" / P6Core."Fact - Activity Spread"."At Completion Total Cost" * 100
Fact - Primavera - Activity Percent Completes Cost % of Planned Fact The proportion of the cost budget that has been spent. Computed as actual total cost / baseline total cost. P6Core."Fact - Activity Spread"."Actual Cost" / P6Core."Fact - Activity Spread"."Budget at Completion" * 100
Fact - Primavera - Activity Percent Completes Expense Cost % Complete Fact The percent complete of cost for all expenses associated with the wbs. Computed as Actual Expense Cost / At Complete Expense Cost * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Expense Cost" / P6Core."Fact - Activity Spread"."At Completion Expense Cost" * 100
Fact - Primavera - Activity Percent Completes Labor Cost % Complete Fact The percent complete of cost for all labor resources assigned to the wbs. Computed as Actual Labor Cost / At Complete Labor Cost * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Labor Cost" / P6Core."Fact - Activity Spread"."At Completion Labor Cost" * 100
Fact - Primavera - Activity Percent Completes Labor Units % Complete Fact The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Labor Units" / P6Core."Fact - Activity Spread"."At Completion Labor Units" * 100
Fact - Primavera - Activity Percent Completes Material Cost % Complete Fact The percent complete of cost for all material resources assigned to the wbs. Computed as Actual Material Cost / At Complete Material Cost * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Material Cost" / P6Core."Fact - Activity Spread"."At Completion Material Cost" * 100
Fact - Primavera - Activity Percent Completes Nonlabor Cost % Complete Fact The percent complete of cost for all nonlabor resources assigned to the wbs. Computed as Actual Nonlabor Cost / At Complete Nonlabor Cost * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Nonlabor Cost" / P6Core."Fact - Activity Spread"."At Completion Nonlabor Cost" * 100
Fact - Primavera - Activity Percent Completes Nonlabor Units % Complete Fact The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100. P6Core."Fact - Activity Spread"."Actual Nonlabor Units" / P6Core."Fact - Activity Spread"."At Completion Nonlabor Units" * 100
Fact - Primavera - Activity Percent Completes Performance % Complete Fact The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far. P6Core."Fact - Activity Spread"."Earned Value Cost" / P6Core."Fact - Activity Spread"."Budget at Completion" * 100
Fact - Primavera - Activity Percent Completes Perfomance % Complete (Units) Fact Perfomance % Complete (Units) IFNULL(P6Core."Fact - Activity Spread"."Earned Value Labor Units", 0) / IFNULL(P6Core."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units", 0) * 100
Fact - Primavera - Activity Percent Completes Schedule % Complete Fact Schedule % Complete P6Core."Fact - Activity Spread"."Planned Value Cost" / P6Core."Fact - Activity Spread"."Budget at Completion" * 100
Fact - Primavera - Activity Percent Completes Schedule % Complete (Units) Fact Schedule % Complete (Units) IFNULL(P6Core."Fact - Activity Spread"."Planned Value Labor Units", 0) / IFNULL(P6Core."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units", 0) * 100
Fact - Primavera - Activity Percent Completes Units % Complete Fact The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100. ( IFNULL(P6Core."Fact - Activity Spread"."Actual Labor Units", 0) + IFNULL(P6Core."Fact - Activity Spread"."Actual Nonlabor Units", 0)) / ( IFNULL(P6Core."Fact - Activity Spread"."At Completion Labor Units", 0) + IFNULL(P6Core."Fact - Activity Spread"."At Completion Nonlabor Units", 0)) * 100
Fact - Primavera - Activity Units     Units  
Fact - Primavera - Activity Units Actual Labor Units Fact The actual units for all labor resources assigned to the activity sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_LABOR_UNITS)
Fact - Primavera - Activity Units Actual Nonlabor Units Fact The actual units for all nonlabor resources assigned to the activity sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_NONLABOR_UNITS)
Fact - Primavera - Activity Units At Completion Labor Units Fact The labor units at completion is the sum of the actual plus remaining units for all labor resources assigned to the activity. Computed as Actual Labor Units + Remaining Labor Units. Same as the budgeted labor units if the activity is not started and the actual labor units once the activity is completed. sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_LABOR_UNITS)
Fact - Primavera - Activity Units At Completion Nonlabor Units Fact The nonlabor units at completion is the sum of the actual plus remaining units for all nonlabor resources assigned to the activity. Computed as Actual Nonlabor Units + Remaining Nonlabor Units. Same as the budgeted nonlabor units if the activity is not started and the actual nonlabor units once the activity is completed. sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_NONLABOR_UNITS)
Fact - Primavera - Activity Units Baseline Actual Labor Units Fact The actual units for all labor resources assigned to the activity in the project baseline sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_LABOR_UNITS)
Fact - Primavera - Activity Units Baseline Actual Nonlabor Units Fact The actual units for all nonlabor resources assigned to the activity in the project baseline sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_NONLABOR_UNITS)
Fact - Primavera - Activity Units Baseline Project Labor Units Fact The sum of the Budgeted (or At Completion) units for all labor resources assigned to the activity in the project baseline. sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_LABOR_UNITS)
Fact - Primavera - Activity Units Baseline Project Nonlabor Units Fact The sum of the Budgeted (or At Completion) units for all nonlabor resources assigned to the activity in the project baseline sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_NONLABOR_UNITS)
Fact - Primavera - Activity Units Planned Labor Units Fact The budgeted units for all labor resources assigned to the activity sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_LABOR_UNITS)
Fact - Primavera - Activity Units Planned Nonlabor Units Fact The budgeted units for all nonlabor resources assigned to the activity sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_NONLABOR_UNITS)
Fact - Primavera - Activity Units Remaining Labor Units Fact The remaining units for all labor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the budgeted units. After the activity is completed, the remaining units are zero. sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LABOR_UNITS)
Fact - Primavera - Activity Units Remaining Late Labor Units Fact Remaining Late Labor Units sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_LABOR_UNITS)
Fact - Primavera - Activity Units Remaining Late Nonlabor Units Fact Remaining Late Nonlabor Units sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_NONLABOR_UNITS)
Fact - Primavera - Activity Units Remaining Nonlabor Units Fact The remaining units for all nonlabor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the budgeted units. After the activity is completed, the remaining units are zero. sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_NONLABOR_UNITS)
           
Activity Folder          
Activity Dates - (Activity) Actual Finish Dimension The date on which the activity actually finished Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_FINISH_DATE
Activity Dates - (Activity) Actual Start Dimension The date on which the activity actually started Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_START_DATE
Activity Dates - (Activity) Baseline Project Finish Dimension The Project Baseline Planned Finish Date Value Derived From : Dim_W_ACTIVITY_D_Activity.BASELINE_FINISH_DATE
Activity Dates - (Activity) Baseline Project Start Dimension The Project Baseline Planned Start Date Value Derived From : Dim_W_ACTIVITY_D_Activity.BASELINE_START_DATE
Activity Dates - (Activity) Data Date Dimension The current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied. Value Derived From : Dim_W_ACTIVITY_D_Activity.DATA_DATE
Activity Dates - (Activity) Early Finish Dimension The earliest possible date the activity can finish. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability. Value Derived From : Dim_W_ACTIVITY_D_Activity.EARLY_FINISH_DATE
Activity Dates - (Activity) Early Start Dimension The earliest possible date the remaining work for the activity can begin. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability. Value Derived From : Dim_W_ACTIVITY_D_Activity.EARLY_START_DATE
Activity Dates - (Activity) Expected Finish Dimension The date the activity is expected to finish. Typically, this date is entered in the Timesheets module by the primary resource. Value Derived From : Dim_W_ACTIVITY_D_Activity.EXPECT_FINISH_DATE
Activity Dates - (Activity) External Early Start Dimension The External Early Start date is the earliest finish date of all lost external relationships. This field is populated only during import when a relationship is lost because it does not exist in the current database. This date may be used to calculate the start date of the current activity in place of the true relationship when scheduling. Value Derived From : Dim_W_ACTIVITY_D_Activity.EXTERNAL_EARLY_START_DATE
Activity Dates - (Activity) External Late Finish Dimension The External Late Finish date is the latest start date of all lost external relationships. This field is populated only during import when a relationship is lost because it does not exist in the current database. This date may be used to calculate the finish date of the current activity in place of the true relationship when scheduling. Value Derived From : Dim_W_ACTIVITY_D_Activity.EXTERNAL_LATE_FINISH_DATE
Activity Dates - (Activity) Finish Dimension The current finish date of the activity. Set to the activity remaining early finish date while the activity is not started or in progress, and the actual finish date once the activity is completed. Value Derived From : Dim_W_ACTIVITY_D_Activity.FINISH_DATE
Activity Dates - (Activity) Late Finish Dimension The latest possible date the activity must finish without delaying the project finish date. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability. Value Derived From : Dim_W_ACTIVITY_D_Activity.LATE_FINISH_DATE
Activity Dates - (Activity) Late Start Dimension The latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability. Value Derived From : Dim_W_ACTIVITY_D_Activity.LATE_START_DATE
Activity Dates - (Activity) Planned Finish Dimension The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started. Value Derived From : Dim_W_ACTIVITY_D_Activity.PLANNED_FINISH_DATE
Activity Dates - (Activity) Planned Start Dimension The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started. Value Derived From : Dim_W_ACTIVITY_D_Activity.PLANNED_START_DATE
Activity Dates - (Activity) Primary Constraint Date Dimension The constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler. Value Derived From : Dim_W_ACTIVITY_D_Activity.PRIMARY_CONSTRAINT_DATE
Activity Dates - (Activity) Remaining Early Finish Dimension The date the remaining work for the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date. This is the finish date that Progress Reporter users follow. Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_FINISH_DATE
Activity Dates - (Activity) Remaining Early Start Dimension The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date. This is the start date that Progress Reporter users follow. Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_START_DATE
Activity Dates - (Activity) Remaining Late Finish Dimension Remaining late end date as calculated by the scheduler Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_LATE_FINISH_DATE
Activity Dates - (Activity) Remaining Late Start Dimension Remaining late start date as calculated by the scheduler Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_LATE_START_DATE
Activity Dates - (Activity) Resume Date Dimension The date progress is resumed on an activity Value Derived From : Dim_W_ACTIVITY_D_Activity.RESUME_DATE
Activity Dates - (Activity) Secondary Constraint Date Dimension The second constraint date for the activity, if the activity has a constraint Value Derived From : Dim_W_ACTIVITY_D_Activity.SECONDARY_CONSTRAINT_DATE
Activity Dates - (Activity) Start Dimension The current start date of the activity. Set to the activity remaining early start date while the activity is not started, and the actual start date once the activity is started. Value Derived From : Dim_W_ACTIVITY_D_Activity.START_DATE
Activity Dates - (Activity) Suspend Date Dimension The date progress is suspended on an activity Value Derived From : Dim_W_ACTIVITY_D_Activity.SUSPEND_DATE
Activity Durations - (Activity) Actual Duration Dimension Actual duration is the total working time from the activity actual start date to the actual finish date (for completed activities), or to the current data date (for in-progress activities). The actual working time is computed using the activity's calendar. Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_DURATION
Activity Durations - (Activity) At Completion Duration Dimension The duration at completion is the total working time from the activity's current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activity's calendar. Value Derived From : Dim_W_ACTIVITY_D_Activity.AT_COMPLETION_DURATION
Activity Durations - (Activity) Baseline Project Duration Dimension The duration for the activity in the primary baseline Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_DURATION
Activity Durations - (Activity) Baseline Planned Duration Dimension Baseline Planned Duration is the total working time from the baseline activity planned start date to the baseline planned finish date. The baseline planned working time is computed using the activity's calendar. Value Derived From : Dim_W_ACTIVITY_D_Activity.BASELINE_PLANNED_DURATION
Activity Durations - (Activity) Free Float Dimension The amount of time the activity can be delayed before delaying the start date of any successor activity. Value Derived From : Dim_W_ACTIVITY_D_Activity.FREE_FLOAT
Activity Durations - (Activity) Original Duration Dimension Original Duration is the total working time from the activity planned start date to the planned finish date. The planned working time is computed using the activity's calendar. Value Derived From : Dim_W_ACTIVITY_D_Activity.PLANNED_DURATION
Activity Durations - (Activity) Remaining Duration Dimension Remaining duration is the total working time from the activity remaining start date to the remaining finish date. The remaining working time is computed using the activity's calendar. Before the activity is started, the remaining duration is the same as the Original Duration. After the activity is completed the remaining duration is zero. Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_DURATION
Activity Durations - (Activity) Remaining Float Dimension The amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as Late Finish - Remaining Finish. If the remaining finish is the same as the early finish ( in general, when the activity is not started), then the remaining float is the same as the total float. Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_FLOAT
Activity Durations - (Activity) Total Float Dimension The amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as Late Start - Early Start or as Late Finish - Early Finish; this option can be set when running the project scheduler. Value Derived From : Dim_W_ACTIVITY_D_Activity.TOTAL_FLOAT
Activity Durations - (Activity) Variance - Baseline Project Duration Dimension The duration between the activity's baseline duration and the at completion duration. Calculated as Planned Duration minus At Completion Duration. Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_VARIANCE
Activity Durations - (Activity) Variance - Baseline Project Finish Date Dimension The duration between the current project finish date and the baseline project finish date. Calculated as Finish minus Baseline Project Finish. Value Derived From : Dim_W_ACTIVITY_D_Activity.FINISH_DATE_VARIANCE
Activity Durations - (Activity) Variance - Baseline Project Start Date Dimension The duration between the current project start date and the baseline start date. Calculated as Start minus Baseline Project Start. Value Derived From : Dim_W_ACTIVITY_D_Activity.START_DATE_VARIANCE
Activity General - (Activity) Activity ID Dimension A short ID which uniquely identifies the activity within the project. Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_ID
Activity General - (Activity) Activity Name Dimension The name of the activity. The activity name does not have to be unique. Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_NAME
Activity General - (Activity) Activity Owner Dimension User who owns the activity Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_OWNER
Activity General - (Activity) Activity Status Dimension The current status of the activity, either Not Started, In Progress, or Completed. Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_STATUS
Activity General - (Activity) Activity Type Dimension The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone' or 'Finish Milestone'. A Task Dependent activity is scheduled using the activity's calendar rather than the calendars of the assigned resources. A Resource Dependent activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A Start/Finish Milestone is a zero-duration activity, marking a significant start/end of project event. A Level of Effort activity has a duration which is determined by its dependent activities. Administration-type activities are typically level of effort. Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_TYPE
Activity General - (Activity) Auto Compute Actuals Dimension Identifies whether the actual and remaining units, start date, finish date, and percent complete for the activity are computed automatically using the planned dates, budgeted units and the activity's schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. This assumes that all work for the activity proceeds according to plan. Value Derived From : Dim_W_ACTIVITY_D_Activity.AUTO_COMPUTE_ACTUALS_FLAG
Activity General - (Activity) Calendar Name Dimension The calendar assigned to the activity. Activity calendars can be assigned from the global calendar pool or the project calendar pool. Value Derived From : Dim_W_ACTIVITY_D_Activity.CALENDAR_NAME
Activity General - (Activity) Criticality Index Dimension Criticality Index Value Derived From : Dim_W_ACTIVITY_D_Activity.CRITICALITY_INDEX
Activity General - (Activity) Duration Type Dimension The duration type of the activity. One of Fixed Units per Time, Fixed Duration, or Fixed Units. For Fixed Units per Time activities, the resource units per time are constant when the activity duration or units are changed. This type is used when an activity has fixed resources with fixed productivity output per time period. For Fixed Duration activities, the activity duration is constant as the units or resource units per time are changed. This type is used when the activity is to be completed within a fixed time period regardless of the resources assigned. For Fixed Units activities, the activity units are constant when the duration or resource units per time are changed. This type is used when the total amount of work is fixed, and increasing the resources can decrease the activity duration. Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_TYPE
Activity General - (Activity) Critical Dimension Indicates whether the activity is critical. An activity is critical when its Total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project. Value Derived From : Dim_W_ACTIVITY_D_Activity.IS_CRITICAL
Activity General - (Activity) Longest Path Dimension Indicates whether an activity is on the longest path. The longest path is defined as activities that are on the critical path and determine the end date of the project. Defining critical activities based on the longest path in the project provides an alternative to viewing critical activities based on float. Value Derived From : Dim_W_ACTIVITY_D_Activity.IS_LONGEST_PATH
Activity General - (Activity) Activity Leveling Priority Dimension The activity priority can be used to prioritize activities in a project when performing resource leveling. Value Derived From : Dim_W_ACTIVITY_D_Activity.LEVELING_PRIORITY
Activity General - (Activity) Percent Complete Type Dimension The activity percent complete type is one of Duration, Units, or Physical. The percent complete type controls whether the Activity % Complete is tied to the Duration % Complete, the Units % Complete, or the Physical % Complete for the activity. Set the percent complete type to Duration for activities which are duration driven, for example, administration tasks and training classes. Set the percent complete type to Physical for activities which are work-product driven, for example, creating a document or a product. Set the percent complete type to Units for activities which are work effort driven, for example, providing a consulting service. Value Derived From : Dim_W_ACTIVITY_D_Activity.COMPLETE_PCT_TYPE
Activity General - (Activity) Primary Constraint Dimension The type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler. Start date constraints are 'Start On', 'Start On or Before', 'Start On or After' and 'Mandatory Start'. Finish date constraints are 'Finish On', 'Finish On or Before', 'Finish On or After' and 'Mandatory Finish'. Another type of constraint, 'As Late as Possible', schedules the activity as late as possible based on the available free float. Value Derived From : Dim_W_ACTIVITY_D_Activity.PRIMARY_CONSTRAINT_TYPE
Activity General - (Activity) Primary Resource Dimension The primary resource for the activity. The primary resource is responsible for the overall work on the activity and updates the activity status using Progress Reporter. Value Derived From : Dim_W_ACTIVITY_D_Activity.PRIMARY_RESOURCE_NAME
Activity General - (Activity) Secondary Constraint Dimension The second type of constraint applied to the activity start or finish date. Value Derived From : Dim_W_ACTIVITY_D_Activity.SECONDARY_CONSTRAINT_TYPE
Activity General - (Activity) WBS Code Dimension The Work Breakdown Structure Code for the activity Value Derived From : Dim_W_ACTIVITY_D_Activity.WBS_CODE
Activity General - (Activity) WBS Name Dimension The Work Breakdown Structure Name for the activity Value Derived From : Dim_W_ACTIVITY_D_Activity.WBS_NAME
Activity Location - (Activity) Address Line 1 Dimension The first line of the address Value Derived From : Dim_W_ACTIVITY_D_Activity.ADDRESS_LINE1
Activity Location - (Activity) Address Line 2 Dimension The second line of the address Value Derived From : Dim_W_ACTIVITY_D_Activity.ADDRESS_LINE2
Activity Location - (Activity) City Name Dimension The city name for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.CITY_NAME
Activity Location - (Activity) Country Code Dimension The country code for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.COUNTRY_CODE
Activity Location - (Activity) Country Name Dimension The country name for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.COUNTRY_NAME
Activity Location - (Activity) Latitude Dimension The latitude for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.LATITUDE
Activity Location - (Activity) Location Name Dimension The name of the location Value Derived From : Dim_W_ACTIVITY_D_Activity.LOCATION_NAME
Activity Location - (Activity) Location Type Dimension Location Type Value Derived From : Dim_W_ACTIVITY_D_Activity.LOCATION_TYPE
Activity Location - (Activity) Longitude Dimension The longitude for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.LONGITUDE
Activity Location - (Activity) Municipality Name Dimension The municipality name for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.MUNICIPALITY_NAME
Activity Location - (Activity) Postal Code Dimension The postal code for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.POSTAL_CODE
Activity Location - (Activity) State/Province Code Dimension The state abbreviation for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.STATE_CODE
Activity Location - (Activity) State/Province Name Dimension The state name for this Location Value Derived From : Dim_W_ACTIVITY_D_Activity.STATE_NAME
Activity Multiple Float Paths - (Activity) Float Path Dimension The project scheduler determines the most critical and sub-critical paths. The float path field identifies the critical path that each activity is on. The number starts from 1 (where 1 is most critical) to the max number of float paths identified by the scheduler. This field is used when determining multiple float paths using the Free Float and Total Float method. Value Derived From : Dim_W_ACTIVITY_D_Activity.FLOAT_PATH
Activity Multiple Float Paths - (Activity) Float Path Order Dimension This field is computed by the project scheduler and identifies the order in which the activities were processed within the float path. Value Derived From : Dim_W_ACTIVITY_D_Activity.FLOAT_PATH_ORDER
Activity Notebooks - (Activity) Create Date Dimension The date the notebook topic was created Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_CREATE_DT
Activity Notebooks - (Activity) Create User Dimension The user that created the notebook topic Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_CREATE_USER
Activity Notebooks - (Activity) Notebook Topic Name Dimension The name of the notebook topic Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.NOTEBOOK_TOPIC_NAME
Activity Notebooks - (Activity) Notebook Text Lookup The text of the notebook topic Value Derived From : LOOKUP(DENSE "P6Core"."Lookup - Activity Note"."Raw Text", "P6Core"."Dim - Activity Note"."Note Key", "P6Core"."Dim - Activity Note"."Activity Key")
Activity Notebooks - (Activity) Update Date Dimension The date the notebook topic was updated Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_UPDATE_DT
Activity Notebooks - (Activity) Update User Dimension The last user to update notebook topic Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_UPDATE_USER
Activity Steps - (Activity) Activity Step Object ID Dimension The Unique ID of the activity step Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.ACTIVITY_STEP_OBJECT_ID
Activity Steps - (Activity) Step Name Dimension The name of the step Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.STEP_NAME
Activity Steps - (Activity) Step Weight Dimension Step weight determines the importance of this step in relation to other steps assigned to the activity. Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.STEP_WEIGHT
Activity Steps - (Activity) Weight Complete Dimension Step weight associated percent complete. Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.WEIGHT_COMPLETE
Activity Steps - (Activity) Step Percent Complete Dimension The percent complete of this specific step. This is manually entered. Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.STEP_PERCENT_COMPLETE
Activity Percent Completes - (Activity) Duration % Of Planned Dimension The percent complete of the activity duration. Computed as (Planned Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Planned Duration is taken from the current plan, not from the baseline. Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_PCT_OF_PLANNED
Activity Percent Completes - (Activity) Duration % Complete Dimension The percent complete of the activity duration. Computed as (Original Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Original Duration is taken from the current plan, not from the baseline. Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_PCT_COMPLETE
Activity Percent Completes - (Activity) Expense Cost % Complete Dimension Percent complete of cost for all expenses associated with an activity. Computed as Actual Expense Cost / At Completion Expense Cost* 100. Always in the range 0 to 100. Value Derived From : Dim_W_ACTIVITY_D_Activity.EXPENSE_COST_PCT_COMPLETE
Activity Percent Completes - (Activity) Labor Units % Complete Dimension The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100. Value Derived From : Dim_W_ACTIVITY_D_Activity.LABOR_UNITS_PCT_COMPLETE
Activity Percent Completes - (Activity) Nonlabor Cost % Complete Dimension The percent complete of cost for all nonlabor resources assigned to the activity. Computed as Actual Nonlabor Cost / At Completion Nonlabor Cost * 100. Always in the range 0 to 100. Value Derived From : Dim_W_ACTIVITY_D_Activity.NONLABOR_COST_PCT_COMPLETE
Activity Percent Completes - (Activity) Nonlabor Units % Complete Dimension The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100. Value Derived From : Dim_W_ACTIVITY_D_Activity.NONLABOR_UNITS_PCT_COMPLETE
Activity Percent Completes - (Activity) Percent Complete Dimension The activity percent complete. This value is tied to the activity Duration % Complete, Units % Complete, or Physical % Complete, depending on the setting for the activity's Percent Complete Type, which is one of Duration, Units, or Physical. Always in the range 0 to 100. Value Derived From : Dim_W_ACTIVITY_D_Activity.PERCENT_COMPLETE
Activity Percent Completes - (Activity) Performance % Complete Dimension The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far. Value Derived From : Dim_W_ACTIVITY_D_Activity.PERFORMANCE_PCT_COMPLETE
Activity Percent Completes - (Activity) Physical % Complete Dimension The physical percent complete can either be user entered or calculated from the activity's weighted steps. There is a project setting specifying this. Value Derived From : Dim_W_ACTIVITY_D_Activity.PHYSICAL_PCT_COMPLETE
Activity Percent Completes - (Activity) Schedule % Complete Dimension The activity schedule percent complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. Computed based on where the current data date falls between the activity's baseline start and finish dates. If the data date is earlier than the baseline Start, the Schedule % Complete is 0. If the data date is later than the baseline Finish, the Schedule % Complete is 100. The Schedule % Complete indicates how much of the activity duration should be currently completed, relative to the selected baseline. Value Derived From : Dim_W_ACTIVITY_D_Activity.SCHEDULE_PCT_COMPLETE
Activity Percent Completes - (Activity) Units % Complete Dimension The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100. Value Derived From : Dim_W_ACTIVITY_D_Activity.UNITS_PCT_COMPLETE
Activity Relationships - (Activity)     Relationships Activity Information  
Activity Relationships - (Activity) Lag Dimension The lag assigned to the relationship. Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.LAG
Activity Relationships - (Activity) Predecessor Activity ID Dimension The ID of the predecessor activity. Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.PRED_ACT_ID
Activity Relationships - (Activity) Predecessor Activity Name Dimension The name of the predecessor activity. Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.PRED_ACT_NAME
Activity Relationships - (Activity) Relationship Type Dimension The relationship type (Finish to Start, Start to Start, etc.). Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.RELATIONSHIP_TYPE
Activity Relationships - (Activity) Successor Activity ID Dimension The ID of the successor activity. Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.SUCC_ACT_ID
Activity Relationships - (Activity) Successor Activity Name Dimension The name of the successor activity. Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.SUCC_ACT_NAME
Activity Relationships - (Activity) Type Dimension The type of the activity based on the relationship (predecessor, successor, or orphan). Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.TYPE
           
EPS Folder          
EPS   EPS Id Level 1 Dimension EPS Id Level 1 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV1
EPS   EPS Id Level 10 Dimension EPS Id Level 10 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV10
EPS   EPS Id Level 11 Dimension EPS Id Level 11 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV11
EPS   EPS Id Level 12 Dimension EPS Id Level 12 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV12
EPS   EPS Id Level 13 Dimension EPS Id Level 13 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV13
EPS   EPS Id Level 14 Dimension EPS Id Level 14 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV14
EPS   EPS Id Level 15 Dimension EPS Id Level 15 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV15
EPS   EPS Id Level 16 Dimension EPS Id Level 16 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV16
EPS   EPS Id Level 17 Dimension EPS Id Level 17 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV17
EPS   EPS Id Level 2 Dimension EPS Id Level 2 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV2
EPS   EPS Id Level 3 Dimension EPS Id Level 3 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV3
EPS   EPS Id Level 4 Dimension EPS Id Level 4 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV4
EPS   EPS Id Level 5 Dimension EPS Id Level 5 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV5
EPS   EPS Id Level 6 Dimension EPS Id Level 6 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV6
EPS   EPS Id Level 7 Dimension EPS Id Level 7 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV7
EPS   EPS Id Level 8 Dimension EPS Id Level 8 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV8
EPS   EPS Id Level 9 Dimension EPS Id Level 9 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV9
EPS   EPS Name Level 1 Dimension EPS Name Level 1 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV1
EPS   EPS Name Level 10 Dimension EPS Name Level 10 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV10
EPS   EPS Name Level 11 Dimension EPS Name Level 11 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV11
EPS   EPS Name Level 12 Dimension EPS Name Level 12 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV12
EPS   EPS Name Level 13 Dimension EPS Name Level 13 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV13
EPS   EPS Name Level 14 Dimension EPS Name Level 14 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV14
EPS   EPS Name Level 15 Dimension EPS Name Level 15 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV15
EPS   EPS Name Level 16 Dimension EPS Name Level 16 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV16
EPS   EPS Name Level 17 Dimension EPS Name Level 17 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV17
EPS   EPS Name Level 2 Dimension EPS Name Level 2 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV2
EPS   EPS Name Level 3 Dimension EPS Name Level 3 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV3
EPS   EPS Name Level 4 Dimension EPS Name Level 4 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV4
EPS   EPS Name Level 5 Dimension EPS Name Level 5 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV5
EPS   EPS Name Level 6 Dimension EPS Name Level 6 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV6
EPS   EPS Name Level 7 Dimension EPS Name Level 7 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV7
EPS   EPS Name Level 8 Dimension EPS Name Level 8 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV8
EPS   EPS Name Level 9 Dimension EPS Name Level 9 Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV9
           
EPS Notebooks - (EPS) Create Date Dimension The date the notebook topic was created Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_CREATE_DT
EPS Notebooks - (EPS) Create User Dimension The user that created the notebook topic Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_CREATE_USER
EPS Notebooks - (EPS) Notebook Text Dimension The text of the notebook topic Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.NOTEBOOK_TOPIC_NAME
EPS Notebooks - (EPS) Notebook Topic Name Dimension The name of the notebook topic Value Derived From existing columns using expression: "P6Core"."Lookup - EPS Note"."Raw Text" "P6Core"."Dim - EPS Note"."Note Key" "P6Core"."Dim - EPS Note"."EPS Key"
EPS Notebooks - (EPS) Update Date Dimension The date the notebook topic was updated Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_UPDATE_DT
EPS Notebooks - (EPS) Update User Dimension The last user to update notebook topic Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_UPDATE_USER
           
Expense Folder          
Expense   Accrual Type Dimension The accrual type of the expense. Valid values are 'Start of Activity', 'End of Activity', and 'Uniform over Activity'. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACCRUAL_TYPE
Expense   Actual Cost Dimension The actual cost of the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACTUAL_COST
Expense   Actual Units Dimension The actual units for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACTUAL_UNITS
Expense   At Completion Cost Dimension The at completion cost of the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.AT_COMPLETION_COST
Expense   At Completion Units Dimension The at completion units for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.AT_COMPLETION_UNITS
Expense   Auto Compute Dimension Identifies whether the percent complete and actual/remaining units and costs for the expense are computed automatically using the status and percent complete of the associated activity. If this option is selected, the percent complete and actual/remaining units and costs are automatically updated when project actuals are applied. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.AUTO_COMPUTE
Expense   CBS Code Dimension The full cost code associated with the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.CBS_CODE
Expense   CBS Name Dimension The name of the cost code associated with the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.CBS_NAME
Expense   Cost Account ID Dimension The ID of the cost account associated with the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.COST_ACCOUNT_ID
Expense   Cost Account Name Dimension The name of the cost account associated with the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.COST_ACCOUNT_NAME
Expense   Document Number Dimension The document number for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.DOCUMENT_NUMBER
Expense   Expense Category Name Dimension The category name of the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.EXPENSE_CAT_NAME
Expense   Expense Item Dimension The name of the expense Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.EXPENSE_ITEM
Expense   Unique Expense ID Dimension The unique ID of the expense Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACTIVITY_EXPENSE_OBJECT_ID
Expense   Expense Percent Complete Dimension The percent complete for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.EXPENSE_PERCENT_COMPLETE
Expense   Over Budget Dimension Identifies whether actual cost exceeds the budgeted cost for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.OVER_BUDGET
Expense   Planned Cost Dimension The planned cost of the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.PLANNED_COST
Expense   Planned Units Dimension The planned units for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.PLANNED_UNITS
Expense   Price Per Unit Dimension The price per unit for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.PRICE_PER_UNIT
Expense   Remaining Cost Dimension The remaining cost of the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.REMAINING_COST
Expense   Remaining Units Dimension The remaining units for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.REMAINING_UNITS
Expense   Unit Of Measure Dimension The unit of measure for the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.UNIT_OF_MEASURE
Expense   Vendor Name Dimension The name of the vendor associated with the expense. Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.VENDOR_NAME
           
Resource Folder          
Resource General - (Resource) Active Dimension Indicates whether the resource is currently active. Nonactive resources may have left the organization but are not deleted from the system since they may have actual hours. Value Derived From : Dim_W_RESOURCE_D_Resource.ACTIVE_FLAG
Resource General - (Resource) Datasource Id Dimension A unique source Id created for the Primavera data source being used. Used to identify data sources when using multiple Primavera data sources. Value Derived From : Dim_W_RESOURCE_D_Resource.DATASOURCE_ID
Resource General - (Resource) Primary Role Name Dimension The name of the role that is assigned as the resource's primary role Value Derived From : Dim_W_RESOURCE_D_Resource.PRIMARY_ROLE_NAME
Resource General - (Resource) Unique Primary Role Id Dimension The unique Id of the role that is assigned as the resource's primary role Value Derived From : Dim_W_RESOURCE_D_Resource.PRIMARY_ROLE_OBJECT_ID
Resource General - (Resource) Primary Resource ID Dimension A short code which uniquely identifies the resource Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_ID
Resource General - (Resource) Primary Resource Name Dimension The name of the resource Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_NAME
Resource General - (Resource) Title Dimension The title of the resource Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_TITLE
Resource General - (Resource) Resource Type Dimension Indicates whether the resource is labor, nonlabor, or material Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_TYPE
Resource Location - (Resource) Address Line 1 Dimension The first line of the address Value Derived From : Dim_W_RESOURCE_D_Resource.ADDRESS_LINE1
Resource Location - (Resource) Address Line 2 Dimension The second line of the address Value Derived From : Dim_W_RESOURCE_D_Resource.ADDRESS_LINE2
Resource Location - (Resource) City Name Dimension The city name for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.CITY_NAME
Resource Location - (Resource) Country Code Dimension The country code for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.COUNTRY_CODE
Resource Location - (Resource) Country Name Dimension The country name for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.COUNTRY_NAME
Resource Location - (Resource) Latitude Dimension The latitude for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.LATITUDE
Resource Location - (Resource) Location Name Dimension The name of the location Value Derived From : Dim_W_RESOURCE_D_Resource.LOCATION_NAME
Resource Location - (Resource) Location Type Dimension Location Type Value Derived From : Dim_W_RESOURCE_D_Resource.LOCATION_TYPE
Resource Location - (Resource) Longitude Dimension The longitude for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.LONGITUDE
Resource Location - (Resource) Municipality Name Dimension The municipality name for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.MUNICIPALITY_NAME
Resource Location - (Resource) Postal Code Dimension The postal code for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.POSTAL_CODE
Resource Location - (Resource) State/Province Code Dimension The state abbreviation for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.STATE_CODE
Resource Location - (Resource) State/Province Name Dimension The state name for this Location Value Derived From : Dim_W_RESOURCE_D_Resource.STATE_NAME
Resource Resource Hierarchy - (Resource)   Dimension Resource Hierarchy  
Resource Resource Hierarchy - (Resource) Full Path Name Dimension Full Path Name Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.FULL_PATH_NAME
Resource Resource Hierarchy - (Resource) Resource ID Dimension Resource ID Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID
Resource Resource Hierarchy - (Resource) Resource ID Level 1 Dimension Resource ID Level 1 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV1
Resource Resource Hierarchy - (Resource) Resource ID Level 10 Dimension Resource ID Level 10 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV10
Resource Resource Hierarchy - (Resource) Resource ID Level 11 Dimension Resource ID Level 11 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV11
Resource Resource Hierarchy - (Resource) Resource ID Level 12 Dimension Resource ID Level 12 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV12
Resource Resource Hierarchy - (Resource) Resource ID Level 13 Dimension Resource ID Level 13 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV13
Resource Resource Hierarchy - (Resource) Resource ID Level 14 Dimension Resource ID Level 14 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV14
Resource Resource Hierarchy - (Resource) Resource ID Level 15 Dimension Resource ID Level 15 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV15
Resource Resource Hierarchy - (Resource) Resource ID Level 16 Dimension Resource ID Level 16 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV16
Resource Resource Hierarchy - (Resource) Resource ID Level 17 Dimension Resource ID Level 17 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV17
Resource Resource Hierarchy - (Resource) Resource ID Level 18 Dimension Resource ID Level 18 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV18
Resource Resource Hierarchy - (Resource) Resource ID Level 19 Dimension Resource ID Level 19 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV19
Resource Resource Hierarchy - (Resource) Resource ID Level 2 Dimension Resource ID Level 2 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV2
Resource Resource Hierarchy - (Resource) Resource ID Level 20 Dimension Resource ID Level 20 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV20
Resource Resource Hierarchy - (Resource) Resource ID Level 21 Dimension Resource ID Level 21 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV21
Resource Resource Hierarchy - (Resource) Resource ID Level 22 Dimension Resource ID Level 22 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV22
Resource Resource Hierarchy - (Resource) Resource ID Level 23 Dimension Resource ID Level 23 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV23
Resource Resource Hierarchy - (Resource) Resource ID Level 24 Dimension Resource ID Level 24 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV24
Resource Resource Hierarchy - (Resource) Resource ID Level 3 Dimension Resource ID Level 3 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV3
Resource Resource Hierarchy - (Resource) Resource ID Level 4 Dimension Resource ID Level 4 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV4
Resource Resource Hierarchy - (Resource) Resource ID Level 5 Dimension Resource ID Level 5 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV5
Resource Resource Hierarchy - (Resource) Resource ID Level 6 Dimension Resource ID Level 6 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV6
Resource Resource Hierarchy - (Resource) Resource ID Level 7 Dimension Resource ID Level 7 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV7
Resource Resource Hierarchy - (Resource) Resource ID Level 8 Dimension Resource ID Level 8 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV8
Resource Resource Hierarchy - (Resource) Resource ID Level 9 Dimension Resource ID Level 9 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV9
Resource Resource Hierarchy - (Resource) Resource Level Dimension Resource Level Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.LVL
Resource Resource Hierarchy - (Resource) Resource Name Dimension Resource Name Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME
Resource Resource Hierarchy - (Resource) Resource Name Level 1 Dimension Resource Name Level 1 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV1
Resource Resource Hierarchy - (Resource) Resource Name Level 10 Dimension Resource Name Level 10 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV10
Resource Resource Hierarchy - (Resource) Resource Name Level 11 Dimension Resource Name Level 11 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV11
Resource Resource Hierarchy - (Resource) Resource Name Level 12 Dimension Resource Name Level 12 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV12
Resource Resource Hierarchy - (Resource) Resource Name Level 13 Dimension Resource Name Level 13 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV13
Resource Resource Hierarchy - (Resource) Resource Name Level 14 Dimension Resource Name Level 14 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV14
Resource Resource Hierarchy - (Resource) Resource Name Level 15 Dimension Resource Name Level 15 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV15
Resource Resource Hierarchy - (Resource) Resource Name Level 16 Dimension Resource Name Level 16 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV16
Resource Resource Hierarchy - (Resource) Resource Name Level 17 Dimension Resource Name Level 17 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV17
Resource Resource Hierarchy - (Resource) Resource Name Level 18 Dimension Resource Name Level 18 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV18
Resource Resource Hierarchy - (Resource) Resource Name Level 19 Dimension Resource Name Level 19 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV19
Resource Resource Hierarchy - (Resource) Resource Name Level 2 Dimension Resource Name Level 2 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV2
Resource Resource Hierarchy - (Resource) Resource Name Level 20 Dimension Resource Name Level 20 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV20
Resource Resource Hierarchy - (Resource) Resource Name Level 21 Dimension Resource Name Level 21 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV21
Resource Resource Hierarchy - (Resource) Resource Name Level 22 Dimension Resource Name Level 22 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV22
Resource Resource Hierarchy - (Resource) Resource Name Level 23 Dimension Resource Name Level 23 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV23
Resource Resource Hierarchy - (Resource) Resource Name Level 24 Dimension Resource Name Level 24 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV24
Resource Resource Hierarchy - (Resource) Resource Name Level 3 Dimension Resource Name Level 3 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV3
Resource Resource Hierarchy - (Resource) Resource Name Level 4 Dimension Resource Name Level 4 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV4
Resource Resource Hierarchy - (Resource) Resource Name Level 5 Dimension Resource Name Level 5 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV5
Resource Resource Hierarchy - (Resource) Resource Name Level 6 Dimension Resource Name Level 6 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV6
Resource Resource Hierarchy - (Resource) Resource Name Level 7 Dimension Resource Name Level 7 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV7
Resource Resource Hierarchy - (Resource) Resource Name Level 8 Dimension Resource Name Level 8 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV8
Resource Resource Hierarchy - (Resource) Resource Name Level 9 Dimension Resource Name Level 9 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV9
Resource Resource Hierarchy - (Resource) Resource Unique ID Dimension Resource Unique ID Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 1 Dimension Resource Unique ID Level 1 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV1
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 10 Dimension Resource Unique ID Level 10 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV10
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 11 Dimension Resource Unique ID Level 11 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV11
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 12 Dimension Resource Unique ID Level 12 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV12
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 13 Dimension Resource Unique ID Level 13 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV13
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 14 Dimension Resource Unique ID Level 14 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV14
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 15 Dimension Resource Unique ID Level 15 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV15
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 16 Dimension Resource Unique ID Level 16 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV16
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 17 Dimension Resource Unique ID Level 17 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV17
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 18 Dimension Resource Unique ID Level 18 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV18
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 19 Dimension Resource Unique ID Level 19 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV19
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 2 Dimension Resource Unique ID Level 2 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV2
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 20 Dimension Resource Unique ID Level 20 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV20
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 21 Dimension Resource Unique ID Level 21 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV21
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 22 Dimension Resource Unique ID Level 22 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV22
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 23 Dimension Resource Unique ID Level 23 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV23
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 24 Dimension Resource Unique ID Level 24 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV24
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 3 Dimension Resource Unique ID Level 3 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV3
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 4 Dimension Resource Unique ID Level 4 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV4
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 5 Dimension Resource Unique ID Level 5 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV5
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 6 Dimension Resource Unique ID Level 6 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV6
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 7 Dimension Resource Unique ID Level 7 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV7
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 8 Dimension Resource Unique ID Level 8 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV8
Resource Resource Hierarchy - (Resource) Resource Unique ID Level 9 Dimension Resource Unique ID Level 9 Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV9
Resource Resource Hierarchy - (Resource) Root Level Resource ID Dimension Root Level Resource ID Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.ROOT_LEVEL_RESOURCE_ID
Resource Resource Hierarchy - (Resource) Root Level Resource Name Dimension Root Level Resource Name Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.ROOT_LEVEL_RESOURCE_NAME
Resource Resource Hierarchy - (Resource) Root Level Resource Unique ID Dimension Root Level Resource Unique ID Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.ROOT_LEVEL_RESOURCE_ID
           
Portfolio Folder          
Portfolio       Portfolios consist of projects grouped together in a meaningful way. Portfolios are used to do project analysis across the enterprise.  
Portfolio   Portfolio Description Dimension The description of the portfolio Value Derived From : Dim_W_PROJECT_PORTFOLIO_D_Project_Portfolio.PROJECT_PORTFOLIO_DESCR
Portfolio   Portfolio Name Dimension The name of the portfolio Value Derived From : Dim_W_PROJECT_PORTFOLIO_D_Project_Portfolio.PROJECT_PORTFOLIO_NAME
           
Risk Folder          
Risk       Risks are any uncertain events or conditions that, if they occur, have a positive or negative effect on project objectives.  
Risk   Added By Dimension The user the risk was last modified by Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.ADDED_BY
Risk   Added Date Dimension The date the risk was last modified Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.W_CREATE_DT
Risk   Risk Category Dimension The name for a particular type of risk classification Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.CATEGORY
Risk   Cause Dimension The Cause the risk was identified Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.CAUSE
Risk   Description Dimension The risk description Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.DESCRIPTION
Risk   Effect Dimension The Effect of the risk was identified Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.EFFECT
Risk   Risk Exposure Dimension The calculated exposure value for the risk Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.Exposure
Risk   Risk Exposure Finish Dimension Risk Exposure Finish Date Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.EXPOSURE_FINISH
Risk   Risk Exposure Start Dimension Risk Exposure Start Date Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.EXPOSURE_START
Risk   Identified By Resource Id Dimension The short code of the resource that identified the risk Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.IDENTIFIED_BY_RESOURCE_ID
Risk   Identified By Resource Name Dimension The name of the resource that identified the risk Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.IDENTIFIED_BY_RESOURCE_NAME
Risk   Identified Date Dimension The date the risk was identified Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.IDENTIFIED_DATE
Risk   Last Modified By Dimension The user the risk was last modified by Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.LAST_MODIFIED_BY
Risk   Last Modified Date Dimension The date the risk was last modified Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.W_UPDATE_DT
Risk   Owner Dimension The resource who has ownership of the risk Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.OWNER
Risk   Risk Id Dimension The unique ID of the associated risk Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_ID
Risk   Risk Name Dimension The name of the risk Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_NAME
Risk   Risk Status Dimension The current status of the Risk. Valid values are 'Proposed', 'Open', 'Rejected', 'Managed', and 'Impacted'. Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_STATUS
Risk   Risk Type Dimension Determines whether a risk is a threat or an opportunity. A threat will have a negative impact on your project, while an opportunity can have a perceived benefit to the project. Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_TYPE
Risk   Risk Score Dimension The calculated score value of the impact values assigned to the risk. Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.SCORE
Risk   Risk Score Color Dimension Risk Score Color Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.SCORE_COLOR
Risk   Risk Score Text Dimension Risk Score Text Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.SCORE_TEXT
Risk   Risk Total Cost Dimension The total estimated cost for the risk. If the risk has an associated response plan, the cost is calculated from the risk response actions for the response plan. Not available if user does not have View Project Costs-Financial privilege. Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.TOTAL_COST
           
WBS Folder          
WBS WBS Hierarchy - (WBS) Full Path Name Dimension Full path for wbs hierarchy Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.FULL_PATH_NAME
WBS WBS Hierarchy - (WBS) WBS Code (Project Level) Dimension A short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents codes Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.PROJ_LEVEL_SHORT_NAME
WBS WBS Hierarchy - (WBS) WBS Name (Project Level) Dimension The name of the WBS element Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.PROJ_LEVEL_NAME
WBS WBS Hierarchy - (WBS) WBS ID Level 1 Dimension WBS ID Level 1 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV1
WBS WBS Hierarchy - (WBS) WBS ID Level 10 Dimension WBS ID Level 10 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV10
WBS WBS Hierarchy - (WBS) WBS ID Level 11 Dimension WBS ID Level 11 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV11
WBS WBS Hierarchy - (WBS) WBS ID Level 12 Dimension WBS ID Level 12 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV12
WBS WBS Hierarchy - (WBS) WBS ID Level 13 Dimension WBS ID Level 13 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV13
WBS WBS Hierarchy - (WBS) WBS ID Level 14 Dimension WBS ID Level 14 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV14
WBS WBS Hierarchy - (WBS) WBS ID Level 15 Dimension WBS ID Level 15 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV15
WBS WBS Hierarchy - (WBS) WBS ID Level 16 Dimension WBS ID Level 16 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV16
WBS WBS Hierarchy - (WBS) WBS ID Level 17 Dimension WBS ID Level 17 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV17
WBS WBS Hierarchy - (WBS) WBS ID Level 2 Dimension WBS ID Level 2 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV2
WBS WBS Hierarchy - (WBS) WBS ID Level 3 Dimension WBS ID Level 3 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV3
WBS WBS Hierarchy - (WBS) WBS ID Level 4 Dimension WBS ID Level 4 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV4
WBS WBS Hierarchy - (WBS) WBS ID Level 5 Dimension WBS ID Level 5 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV5
WBS WBS Hierarchy - (WBS) WBS ID Level 6 Dimension WBS ID Level 6 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV6
WBS WBS Hierarchy - (WBS) WBS ID Level 7 Dimension WBS ID Level 7 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV7
WBS WBS Hierarchy - (WBS) WBS ID Level 8 Dimension WBS ID Level 8 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV8
WBS WBS Hierarchy - (WBS) WBS ID Level 9 Dimension WBS ID Level 9 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV9
WBS WBS Hierarchy - (WBS) WBS Name Level 1 Dimension WBS Name Level 1 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV1
WBS WBS Hierarchy - (WBS) WBS Name Level 10 Dimension WBS Name Level 10 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV10
WBS WBS Hierarchy - (WBS) WBS Name Level 11 Dimension WBS Name Level 11 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV11
WBS WBS Hierarchy - (WBS) WBS Name Level 12 Dimension WBS Name Level 12 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV12
WBS WBS Hierarchy - (WBS) WBS Name Level 13 Dimension WBS Name Level 13 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV13
WBS WBS Hierarchy - (WBS) WBS Name Level 14 Dimension WBS Name Level 14 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV14
WBS WBS Hierarchy - (WBS) WBS Name Level 15 Dimension WBS Name Level 15 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV15
WBS WBS Hierarchy - (WBS) WBS Name Level 16 Dimension WBS Name Level 16 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV16
WBS WBS Hierarchy - (WBS) WBS Name Level 17 Dimension WBS Name Level 17 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV17
WBS WBS Hierarchy - (WBS) WBS Name Level 2 Dimension WBS Name Level 2 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV2
WBS WBS Hierarchy - (WBS) WBS Name Level 3 Dimension WBS Name Level 3 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV3
WBS WBS Hierarchy - (WBS) WBS Name Level 4 Dimension WBS Name Level 4 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV4
WBS WBS Hierarchy - (WBS) WBS Name Level 5 Dimension WBS Name Level 5 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV5
WBS WBS Hierarchy - (WBS) WBS Name Level 6 Dimension WBS Name Level 6 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV6
WBS WBS Hierarchy - (WBS) WBS Name Level 7 Dimension WBS Name Level 7 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV7
WBS WBS Hierarchy - (WBS) WBS Name Level 8 Dimension WBS Name Level 8 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV8
WBS WBS Hierarchy - (WBS) WBS Name Level 9 Dimension WBS Name Level9 Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV9
WBS Notebooks - (WBS)     WBS level notebook topics.  
WBS Notebooks - (WBS) Create Date Dimension The date the notebook topic was created Value Derived From : The date the notebook topic was created
WBS Notebooks - (WBS) Create User Dimension The user that created the notebook topic Value Derived From : The user that created the notebook topic
WBS Notebooks - (WBS) Notebook Text Lookup The text of the notebook topic P6Core."Lookup - WBS Note"."Notebook Text"
WBS Notebooks - (WBS) Notebook Topic Name Dimension The name of the notebook topic Value Derived From : The name of the notebook topic
WBS Notebooks - (WBS) Update Date Dimension The date the notebook topic was updated Value Derived From : The date the notebook topic was updated
WBS Notebooks - (WBS) Update User Dimension The last user to update notebook topic Value Derived From : The last user to update notebook topic