Safety Observation Business Process

Use the Safety Observation business process to record safety-related issues from the project site.

Characteristics

This is a Project-level business process with a workflow, provided in the system template.

Record Statuses

Status Resulting State
Approved terminal
Canceled terminal
Closed terminal
Awaiting_Review non-terminal
Pending non-terminal
Pending_Approval non-terminal
Revision_Required non-terminal

Related Processes

The Safety Observation business process might create the following business processes: Not applicable

The Safety Observation business process might be created by the following business processes: Not applicable

Workflow

The default workflow for the Safety Observation business process is set up in a certain way; however, it may be used differently by your organization. Typically, a user with the necessary permissions can create the record and either move it directly to the end step or send it to others for review or approval. The recipients in the second step can take the action of approving or rejecting the record or send it on to others.

Creating a Safety Observation Record

Create a Safety Observation record by navigating to Field Management / Safety Observation on the Project/Shell tab, or from the Tasks log on the Home tab or relevant Project/Shell tab.

Complete the Safety Observation form and attach related documents, if needed. After completing the form, select Send if you are finished and ready to commit the record.

Note:

You must enter a value in all required fields (*) before you can save the form.
  1. Go to your Project tab, and switch to User mode.
  2. In the left Navigator, select Field Management, and then select Safety Observation.
  3. On the Safety Observation page, select Create. Refer to the tables below to complete the form. You can select Save at any time to create a record and keep it in editable mode.
  4. To add attachments, go to the Attachments tab, and select Attach Files "" .
  5. After completing the form, select Send.
  6. On the Workflow Action Details tab, select who should receive this BP.
    • If permitted, you can add users to the CC list. These users will receive a notification about this BP but are not assigned a task.
    • If permitted, you can select lists of members in the Contact List section. These members also receive a notification about this BP but are not assigned a task.
    • If permitted, you can adjust task due dates for all users, or set individual task due dates for each assignee.
  7. Select Send.
  8. In the Notification window, review the content, and select OK.

    The record moves to the next step in the workflow.

Completing the Safety Observation Form

Observation Information

Key information about this observation

Field Name Access Description
Observation Required Short description of the observation
Observation ID Read-Only ID generated by the system
Observation Type Required Indicate whether the observation is Positive (safe behavior) or Risk (potential hazard)
Status Read-Only  
Hazard Category Editable Classify the type of hazard observed
Method of Identification Required How the safety issue was identified

Observation Description

Field Name Access Description
Observation Description Required Provide a clear, factual account of what was observed, including location, personnel involved, and any relevant circumstances.

Location

Field Name Access Description
Latitude Editable The latitude of an area
Longitude Editable The longitude of an area
Area Template Editable The area template that contains the physical areas related to a project or building
Area Editable The specific area for the Incident item

Risk Management

Field Name Access Description
Severity Editable Severity of the safety observation
Observation Score Read-Only System-generated score based on severity and frequency. Lower score is preferred
Frequency Editable Frequency of the safety observation
Risk Level Read-Only System-generated score based on severity and frequency
Recommended Action Required Suggest specific steps to address the observed risk.
Action Taken Read-Only Document the steps taken to mitigate the risk.

Note:

This field becomes editable in forms at a later stage in the workflow.

Key Dates

Field Name Access Description
Observation Creation (Date/Time) Read-Only  
Observation Due Date Read-Only  
Observation Closed (Date/Time) Editable  

Record Information

System information about this record

Field Name Access Description
Record No. Read-Only System-assigned record number
Creator Read-Only Creator of this record
Record Last Update Date Read-Only Date that the record was last updated
Creation Date Read-Only Date that the record was created
Project Name Read-Only Name of the project
Project Number Read-Only Unique Project Number
Business Process Record URL Read-Only A shareable link to this record, for anyone with the necessary permissions

Owner Information

Populated by the Oracle Construction and Engineering Advisor for Safety

Field Name Access Description
Owner Name (Date/Time) Read-Only Owner or sponsor of this project
Owner ID Read-Only ID of the owner or sponsor of this project
Parent Project Number Read-Only Number of the parent project
Parent Project ID Read-Only ID of the parent project

Completing the Notes Tab

Notes

Field Name Access Description
Notes Required  
Creation Date Editable  
Note Creator Editable