Earned Value Analysis Reports Log

The Earned Value Analysis Reports log enables you to create and run reports. The log contains the following toolbar options:

Field Description
Create This option is available for users with Create permission, at the node level. See Creating an Earned Value Analysis Report.
Delete This option is available for users with Create permission, at the node level.
View

This option enables you to view all, create a new view, and manage views. By default, the All view is selected. To define new views, select Create New View. You can use the Manage Views option to manage the user-defined views.

Note:

Oracle recommends that you do not define a view with no columns selected.
Edit View To change the view of the log.
Refresh This option enables you to refresh the report log and view the latest report definitions that have been added.
Print This option enables you to print the report log information using the options available.
Find on Page Enables you to conduct a text-based search for each column in the log.

The Earned Value Analysis Reports log contains the following columns which correspond to the fields that you have included in the report when you created one, in addition to several more fields:

  • Name
  • Description
  • Earned Value Analysis Scenario
  • Report Template
  • Owner
  • Last Run

The Earned Value Analysis Reports log contains the following tabs:

Tab Description
General Enables you to both view and change some of the fields in the report. When you alter report detail in the General tab, you must save or save and run the report to ensure that your changes have been applied.
Schedule

Enables you to:

  • Set Frequency for Scheduled Report Runs
  • Determine the Output Information

The day value will reset to one, if you enter a numeric value that is out of range.

The report will run on day twentieth of the first month of every quarter, if:

  • You select a day between the first and thirty-first.
  • You select the twentieth day of each quarter.

The email subscription option enables you to control the type of email notifications that you want to receive.

In the user Preferences window (in the upper-right corner, select your name, select Preferences, and then select the Email Subscription tab) you can subscribe to receive emails when reports are scheduled in the EVM reports (Results from scheduled EVA reports). This option will be available only when the Earned Value Manager module is loaded in the company. When you select the option and have a valid email address, you will receive email notification with the report attached. The format of the report is according to the format selected when the scheduled report was set to run. The email received contains the report (as an attachment, in Excel format) with the following information:

  • Source Name: Displays the shell name.
  • Report Name: Displays the EVA report name.
  • Description: Description provided in the EVA report properties.
  • Unifier Login: To go to the login page.

The User Preferences Template window, Preferences tab, displays the option related to the Earned Value Report scheduled runs (Results from scheduled EVA reports option). The system uses the active user's preferences template when creating new users, as default. The other templates can be used to update preference settings for existing users.

History

Enables you to see the following information:

  • Run Date (the date the report was generated)
  • Run By (who generated the report)
  • Status (if the report is generated successfully)

Each report row has a gear menu ("") that enables you to run a report or delete a report:

  • Run Report: You must have View permission to run the report, using the gear menu. This option is shown when you select one report at a time. The report will be displayed using the format saved in the properties.
  • Delete: You must have Full Access and Create permissions to use the delete option. You can select one or more reports to delete.