Earned Value Analysis User Defined Report (UDR)
You can create User Defined Reports (UDRs) from the data present in your Earned Value Analysis.
The Create User-defined Report window enables you to define the following fields for your UDR (template or individual reports):
- Data Type
- Element
- Report Type
- Tabular
- Cross Tab
- Summary
- Alert
- Access Type
Note:
The same fields will be available for permission-based data sources.
The elements (Currency/Decimal), in OOTB Earned Value Analysis along with any user-defined column will be available as DEs for your report.
Note:
Only the data elements available in the Earned Value Analysis Sheet will be available in the respective UDR.