Master Rate Sheet Log: Tabs

The right pane of the Master Rate Sheet log has the following tabs: Audit Log, Schedule, and History

The Audit Log tab tracks all changes made inside the rate sheet.

The Schedule tab allows you to set the frequency of automatically running the Get Data synchronization at daily, weekly, monthly, or quarterly intervals between the specified start and end dates. This feature is only available for a P6 integration.

The History tab captures information about manual/synchronization (schedule get data) job. The toolbar has Refresh and Find on Page functions. When you select Refresh, Unifier refreshes the History. This enables you to track the status of an ongoing synchronization. For example, when you select Get Data, and switch to the History tab, and you see new record with "Running" (sometimes empty), and then select Refresh to see the status changed to "Completed," if the job is done.

Status values for tasks initiated through Get Data for P6 include:

  • Running
  • Completed
  • Failed

Status values for tasks initiated through Get Data for Oracle Integration include:

  • Initiated
  • Started
  • Completed
  • Failed

The following rules are followed while synchronizing the Master Rate Sheet data with P6 or Oracle Primavera Cloud:

  • If a resource/role has been removed from the global list in P6 or Oracle Primavera Cloud, the Master Rate Sheet role/resource and corresponding rates will not change.
  • If a resource/role has been added to the global list in P6 or Oracle Primavera Cloud, the new role/resource is added to the Master Rate Sheet along with its corresponding rates.
  • If the resource/role exists in both P6/Oracle Primavera Cloud and the Master Rate Sheet, the system updates only the resource/role name, if applicable (using resource or role ID as the identifier).