OBS Configuration Package
To access the package:
- Go to the Company Workspace tab, and switch to Admin mode.
- In the left Navigator, select Configuration Package Management, and then select Component Lists.
- From the toolbar, select Create.
- In the New Component List, locate the Activity Manager section, and then locate OBS Attributes.