OBS Sheet Node Log

To access the OBS Sheet log:

  1. Go to the shell tab, and switch to User mode.
  2. In the left Navigator, select Activity Manager, and then select OBS Sheet.

    Note:

    The location may differ in your implementation based on the Project/Shell User Mode Navigator configuration.

You can use the OBS Sheet log to:

  • See the list of OBS sheets with corresponding general information.
  • Access an OBS sheet.

The OBS Sheet log is divided into two panes:

  • Grid or table (left)
  • General tab (right)
  • Audit Log tab (right)

When you select an OBS sheet on the grid, the General tab display the details about the OBS sheet. The Audit Log tab displays a list of events with details. In the General tab, the Name field will be editable if the OBS sheet is not used anywhere. The Description field will always be available for changes. If you have View and Modify permissions, you can export the Audit Log into a CSV file. A CSV export contains all the fields in the OBS sheet.