OBS Templates
- Go to the Company Workspace tab, and switch to Admin mode.
- In the left Navigator, select Templates, and then select OBS Sheets.
- In the OBS Sheets log, select Create to open the Create OBS Sheet window.
- Enter a name in the Name field.
- Enter a description in the Description field.
- Select Create. The OBS Sheets log displays the newly created OBS sheet.
- Select the gear menu (
) on the new OBS sheet, and select Open.
- Proceed to create an OBS structure, under Templates. This can be used when creating the OBS in a shell (see Creating an OBS Sheet).