Prerequisites

To use the Earned Value Management (EVM) module with Primavera P6 or Oracle Primavera Cloud:

  • You must have access to the EVM feature, which is enabled through the User Mode Access settings in Access Control.
  • The Oracle database (DB) used for Unifier must have the DB Partition feature enabled.

To use the EVM module with P6:

  • The following Oracle third-party applications must be available:
    • P6
    • Gateway
  • Unifier and P6 Integration through Gateway must be established.

    Ensure that P6, Gateway, and Unifier integration are configured properly. P6 must have at least one project (if baseline is available in P6 you are set; otherwise, you must use the P6 Current Schedule as baseline).

    The option to enable multiple projects mapping between P6 and Unifier is included in the Shell Attributes form. In the Shell Attributes form, use the Integration tab to map multiple P6 projects with the respective shell in Unifier using P6 Project ID.

To use the EVM module with Oracle Primavera Cloud and Oracle Integration, make sure that you have an account for, and access to, an instance of Oracle Primavera Cloud and Oracle Integration. For more information, see the Unifier General Administration Guide.