Preview Tab
The Preview tab enables you to preview the earned value analysis for the P6 projects (cost loaded and resource loaded) in the activity sheet (System or Manual) without opening the Earned Value Analysis sheet.
- The upper section in the tab displays a graph with consolidated information of PV and AC across data dates. A vertical blue bar represents the last data date.
- The lower section shows the Summary Table with columns displaying EV metrics and derived values, for projects satisfying the last data date:
- BAC, EAC, PV, EV, AC, ETC, RC, CV, SV, VAC, CPI, SPI, CSI, TCPI(EAC), TCPI(BAC).
The lower section (Cumulative Values and Indices) is also referred to as the EV analysis sheet columns. When you open an EV analysis sheet from the Earned Value Analysis log window, the window that opens has both an upper and lower screens which display the information that you could see in the Preview tab.