Rate Sheets Log Tabs

The following explains the tabs in the Rate Sheets log:

Audit Log

The Audit Log tab tracks all the events of the rate sheet and the component roles and resources.

Permissions

Use the Permissions tab to add users and groups and assign permissions for the specific rate sheet:

  • Modify Permission

    Users who have this permission will be able to modify the setup.

  • Edit & Refresh
  • View

The creator of the rate sheet is assigned all permissions by default.

Schedule

You can use the Schedule tab to set a frequency for automatic refresh of rates in the rate sheet at daily, weekly, monthly, or quarterly intervals between the specified start and end dates.