Roll Up of Earned Value Analysis Sheet Columns to WBS Sheet
You can roll up the EV analysis sheet columns (created on a manual activity sheet) to the WBS sheet, similar to the EV analysis sheets that were created through the System Activity Sheet. All the existing options for an EV analysis sheet column in the WBS sheet (columns, data format, and so on) will be available for EV analysis sheet that was created using a manual activity sheet. The EV analysis sheet column for a manual activity sheet is identified by using the template ID, similar to the System Activity Sheet.