System WBS Sheet Log Columns

The following columns appear in the System WBS Sheet log:

  • Sequence No.
  • WBS Code
  • WBS Name
  • ETC Technique
  • Planned Units
  • Planned Total Cost
  • Actual Units
  • Actual Total Cost
  • Remaining Units
  • Remaining Total Cost
  • At Completion Units
  • At Completion Total Cost

The values for the following columns are coming from P6 directly:

Note:

The General tab of each WBS code will not display these columns. In addition, formula values that depend on these columns will not display.

  • Planned Units
  • Planned Total Cost
  • Actual Units
  • Actual Total Cost
  • Remaining Units
  • Remaining Total Cost
  • At Completion Units
  • At Completion Total Cost

When you right-click each column heading, depending on which column on the grid, some or all of the following options will be made available:

Lock after this Column

To lock or release the position of a column on the grid.

Insert

To insert a column through:

  • Business Process Data Source
  • Direct Cell Entry
  • From EVA Sheet
  • From Activity Sheet
  • WBS Custom Attributes
  • Formula
  • Hidden

Hide this Column

To hide the column that you had selected.

Delete

To delete a column.

Properties

To open the Column Properties window and review or change (with limitations) the properties of a column.

When you hover over each column heading, the system displays information about that column.