Integrating Unifier with Oracle Primavera Cloud Overview

All the application-level authentication parameters that are required to integrate Unifier and Oracle Primavera Cloud, for cash flow data, are defined under the Primavera Cloud functional node. When the Unifier Company Administrator selects the Primavera Cloud functional node, the system enables the admin to connect to Primavera Cloud, and ultimately configure the cash flow data sources that can be used to send (push) and receive (pull) the cash flow data from Primavera Cloud. For more information about connecting Unifier to Primavera Cloud, see Oracle Primavera Cloud Integration in UnifierOracle Primavera Cloud Integration in Unifier.

The Unifier project and the Primavera Cloud project are linked in the following ways:

Project service

The project service is used to link Unifier and Primavera Cloud. When the project service link is used, the Company Administrator can add the Primavera Cloud Project ID (retrieved from the Construction and Engineering Lobby) in the Unifier shell (where the project resides).

After the Primavera Cloud Project ID is added to the Unifier shell, all other project details (such as Project Name, Integration Type, and so forth) will be auto-populated in the pertinent fields.

However, if this link has not been established, or if more than one linked Primavera Cloud project is available, the Company Administrator can link the Unifier project and the Primavera Cloud project directly, by way of direct integration as explained below.

Direct integration

The direct integration is used to link Unifier and Primavera Cloud. When the direct integration is used, the Company Administrator can use just the Unifier shell (where the project resides) to link (Add) to the Primavera Cloud by using the Primavera Cloud Project ID (displayed).

If the Add option is not available, the projects have already been linked in the Lobby portal, or through project service, as explained above.

For information about adding the Primavera Cloud Project ID in the Unifier shell, see Oracle Primavera Cloud Integration in Unifier Shell.

Note:

The Construction and Engineering Lobby lets you access your projects that are managed in both Unifier and Primavera Cloud. For details about the Lobby, refer to the Construction and Engineering Lobby Help (https://docs.oracle.com/cd/F23711_01/help/en/202246.htm).

Similar to other nodes, accessing the Primavera Cloud functional node requires attaining proper permissions.