Update Schedule Sheet Activities V2 from Oracle Primavera P6 XML
![]()
Description
This method will insert/update activities into any project/shell schedule sheet. It will not overwrite existing activities in the schedule sheet based on the data mapping parameter.
Support
This method can only support updating of activities in project/shell-level schedule sheets.
Installation: ASP and Self host
| Level | Yes or No |
|---|---|
| Company Level | No |
| Project/Shell Level | Yes |
Prototype
public XMLObject updateScheduleActivitiesV2(String shortname, String authcode, String projectNumber, String sheetName, String sheetXML, String scheduleOptions);
Parameters
| Parameter | Description |
|---|---|
| shortname | Identifier of the company, company's short name |
| authcode | Authentication code for the company, in text string |
| projectNumber | Identifier of a project/shell. |
| sheetname | Name of Schedule Sheet to import activities into. |
| sheetXML | Content of activities to import. This is obtained from the Primavera P5/P6 xml content. The Primavera XML content should be generated by exporting the full Primavera project. |
| scheduleOptions |
This element will allow message to carry optional information. Following are the tags under this element: <MapName/> <ActivityIdentifier/> <CBS_NoOfLevelsToMerge/> <CBS_StartMergeFrom/> <ActivityDeletion/> |
| MapName | Name of the data mapping that should be used while processing XML file |
| ActivityIdentifier | Possible values are GUID, ID. ID is the tag of Activity Id in Primavera. |
| CBS_NoOfLevelsToMerge |
This parameter will take a numeric value. This parameter can be used by user to specify how many levels (CBS Levels) in P6 XML file should be merged.
If you specify 3 then two levels will be merged. But which 3 segments will be based on the next parameter (CBS_startmergefrom) |
| CBS_StartMergeFrom |
|
| ActivityDeletion | Indicate to delete activities from schedule sheet in Unifier if it is deleted in P6. |
Return Value
Sample Method
updateScheduleActivitiesV2("acme","acme_authcode","Proj-0001","Schedule Sheet 001", "<XML Content>","Data Mapping 001","Id");
Additional Information
You must perform appropriate data mapping setups on the target schedule sheet. This includes mapping Unifier Schedule Sheet columns to Primavera XML elements and setting appropriate XML Import options.
This method will insert/update activities into any project/shell schedule sheet. The method will utilize the data mapping setup to update only those elements that are mapped.
The method errors out if the data mapping option does not allow merge.
Activities are uniquely identified within Primavera by the Globally Unique Id (<GUID>) or the identified provided as part of XML file. GUID will be used if ActivityIdentifier is empty or blank.
Resource assignments will be imported (inserted/updated) if the ‘Import Resource Assignments' checkbox is selected. Resource assignments will be matched by Resource Name.
This service can be used for Projects/Shells of cost code type CBS.
- Activity identified with this creation method can be GUID or ID
- On the options tab of Data Mapping, merge existing schedule option should be checked.
- CBS Code will be derived automatically based on the XML file. For more information, see Associate CBS Codes with Activities.
- ActivityDeletion tag logic is based on the "Delete Activity" checkbox available on data mapping window in Unifier. Following is the logic for this tag. ActivityDeletion tags are only considered for updateScheduleSheetFromFileV2 service and not for create.
| Delete Checkbox | Activity Deletion | Behavior |
|---|---|---|
| Deselected | Auto or Confirm |
Activity Deletion tag is ignored. Activities that are removed under source schedule will not be removed from the Schedule Sheet. |
| Selected | Auto |
Activity Deletion tag is considered. Activities that are removed under source schedule will be deleted automatically under Unifier Schedule Sheet. |
| Selected | Confirm |
Activity Deletion tag is considered. Activities that are removed under source schedule will not be deleted. System will return an error and will not update Unifier schedule sheet. If no activities are removed under source schedule, the system will update the Schedule Sheet. |