Project or Shell Cash Flow Properties Curves Pane and Curve Types

This topic provides details about adding curves to the cash flow.

You can construct cash flow curves by:

  • Project/Shell
  • Summary CBS (Summary CBS Code) If you select this option, the system sets the Summary CBS Level to 1 by default. You can select another level, based on what is available in the Cost Sheet.
  • CBS (CBS Code)
  • Commitment (a specific commitment BP and record)

The following topics explains the process for adding the following curves to a cash flow worksheet, for comparison:

  • Baseline curve
  • Forecast curve

    Note:

    The procedures that follow:
    • Assume that you have created your data sources.
    • Describe how to add a curve type to an existing cash flow (using the Detail Level column of the Cash Flow log for the project/shell) that does not have a curve.