Create or Edit Pyramid Charts for Visualizations in Projects/Shells
Prerequisite
You must have the Manage Content permission to perform this task.
Procedure
To create or edit Pyramid charts for visualizations in a project/shell (User mode):
- Sign in to Unifier with project/shell user credentials.
- Select the specific project/shell tab, and switch to User mode.For example, select a tab called Vision Corporation.
- In the left Navigator, select Visualizations.
or
If configured, access the Visualizations log from a business process log as follows:
- In the left Navigator, select Logs, and then select a specific business process, such as Contracts.
- From the Visualization list, just below the User mode indicator, select a visualization.
- In the Visualizations log (right pane), perform one of the following actions:
- Select Create to add a new visualization in the project/shell. Then on the Create page, do the following to preview the data before creating the item:
- From the Data Source list, select the data source to use for creating the content item. The list shows published content in the alphabetical order.
- From the Preview Project list, select an active project/shell and then select Preview Data.
or
- Select a visualization in the log and select Edit. Then on the Edit page, select Edit
for a content item in the visualization layout.
- Select Create to add a new visualization in the project/shell. Then on the Create page, do the following to preview the data before creating the item:
- On the Create or Edit page, specify or update the following information:
- From the View Type list, select Pyramid Chart.
- In the Name field, enter a name for the Pyramid chart.
- Optional: In the Description field, enter a short description about the Pyramid chart.
- From the Value list, select a data element from the data source selected above. A maximum of three values can be selected for a Pyramid chart. Displays Count by default.
For each data element selected in the Value list, select any of the following measures:
- Average: The mean of all values of the selected data element.
- Count: (Default) The total number of rows of the selected data element.
- Max: For numeric fields, displays the highest value. For date fields, displays the maximum date.
- Median: The central value among all values of the selected data element.
- Min: For numeric fields, displays the lowest value of the selected data element. For date fields, displays the minimum date.
- Sum: Sum of all values of the selected data element.
- Optional: From the Color By list, select a non-numeric data element to differentiate using a color-code. A maximum of six colors can be added in the chart. Perform any of the following actions:
- To color-code additional data elements, select Add Color By.
- To remove a color code and the associated data element, select Delete (x).
- If you have selected more than one color code, select Drag
to reorder the color codes.
- If the data element selected in the Value list represents a numeric or currency value, specify the display format for these values:
- From the Decimal Places list, select the number of decimal places following the decimal point to be used for numeric values. Choices include 0 through 8.
- From the Abbreviations list, select the abbreviated format to be used for currency values. Choices include: Auto (default), None, Thousands (K), Millions (M), Billions (B), and Trillions (T).
- From the Currency Options list, select the currency used by the project/shell. Choices include: None, Shell Currency, and Base Currency.
- Make changes as needed to refine the above selections.
- After making all changes, perform any of the following actions:
- To analyze the underlying data of the chart, right-click on a slice and select View <data source> to navigate to the associated BP log, Cost Sheet, or Cash Flow in a new tab.
- If you created a Pyramid chart, select Create, and return to the Edit page.
- To confirm all the changes made to the edited chart, select Update, and return to the Edit page.
- On the Edit page, select Save to update the visualization with any created or edited content.