SP / Meter Suggestions
In order to link a meter to a service point, you must
• Link the meter's meter configuration to the service point by inserting a record on the CI_SP_MTR_HIST table.
• In addition, you must also create a CI_SP_MTR_EVT record. Note the following about this record:
◦ The value of the SP_MTR_EVT_FLG should be I (for installation).
◦ The value of the MTR_ON_OFF_FLG should be 1 (on).
◦ It must reference a read whose read date is the installation date. The reading can be a dummy value unless this customer has not been billed since the install date (i.e., the installation has taken place recently). In this situation, this read must be the true start read for the customer. Note, this read should also be linked to the SA/SP record associated with the SA that's linked to the SP as its start read.
Parent topic