All meters must have an initial configuration that should be effective as of the date the meter was received. If you reconfigure the meter in the future, you must add a new effective-dated configuration to reflect how the meter is configured.
Do not attempt to maintain a meter configuration unless you are familiar with the concepts discussed in
Changing A Configuration.