Importing the Oracle Integration Cloud Project from Oracle Cloud Marketplace
All integration points are shipped as part of a single accelerator project (.car) file.
To import a pre-built integration from Oracle Cloud Marketplace:
1. Launch the Oracle Cloud Marketplace portal.
2. Click Applications.
3. Browse through the list of applications and select the pre-built integration project to import.
4. Click GetApp.
5. Review and accept the “Oracle Standard Terms and Restrictions”.
6. Click Next. The My Oracle Support portal opens.
7. From the integration artifacts table, click the link to download the CCB-OFSC Business Accelerator Project (.car) file from My Oracle Support.
OUTL-BA-CCB_OFSC-01.24.2000
8. Perform the following steps before importing the new Accelerator Project (.car) file into your Oracle Integration Cloud instance.
a. Take the backup of the existing customized integrations and lookups.
b. Perform cleanup by deactivating and deleting the existing flows, connections, lookups, libraries used in the integration, and the .par package file.
Note: If your previous pre-built integration was packaged based (.par file), you will see that:
The package is visible on the Design-Packages page in the Oracle Integration Cloud instance.
The individual integration flows are visible on the Design-Integrations Each integration flow are designated with an Accelerator and BUILT BY ORACLE message displayed.
9. On the Integrations page, the individual integrations of the imported project file that are designated with a BUILT BY ORACLE message are displayed.
To import a project in Oracle Integration Cloud:
1. Login to Oracle Integration Cloud.
2. Navigate to Integrations > Projects.
3. Click Add.
4. Select Import Project and drag-and-drop the .car file downloaded from Oracle Cloud Marketplace.
Note: Make sure to select the Anyone can edit, view, and monitor checkbox.
The new project will show up in the list, but with the “Configured” status due to the connections not being completed yet.
5. Click Project Edit and follow the verification and configuration steps documented in the following sections.
6. If all configurations are complete, activate the integration by:
Clicking Activate in the Design section.
Or, activate the latest deployment plan in the Deploy section.
7. Verify if the OU CCB OFSC project is imported is successfully.