Verifying the Project Import
To verify the project import was successful:
1. Verify that the following 6 integrations are imported successfully as seen in the Integrations section of the project.
• Oracle Utilities CCS WACS Create Service Call
• Oracle Utilities CCS WACS Get Related Documents
• Oracle Utilities CCS WACS Get Service Call Details
• Oracle Utilities CCS WACS Process Service Call
• Oracle Utilities CCS WACS Query Service Call
• Oracle Utilities CCSWACS UpdateOrCancel ServiceCal
2. Verify if the 3 connections listed below are imported successfully as seen in the Connections section of the project.
• Oracle Utilities REST CCS for CCS-WACS
• Oracle Utilities REST WACS for CCS-WACS
• Oracle Utilities REST Outbound for CCS-WACS
3. Make sure that the following 8 lookups are imported successfully as seen in the Lookups section of the project.
• OUTL-BRT-CCS_WACS_ConfigProps
• OUTL-BRT-CCS_WACS_EntityType
• OUTL-BRT-CCS_WACS_Email_ID
• OUTL-BRT-CCS_WACS_HouseType
• OUTL-BRT-CCS_WACS_CallBackCode
• OUTL-BRT-CCS_WACS_ServiceCategory
• OUTL-BRT-CCS_WACS_ServiceCode
• OUTL-BRT-CCS_WACS_CommunicationType
4. Make sure the following library is imported successfully as seen in the Libraries section of the project.
• CCSWACS_ExtractErrorDetails