Readiness Checklist
The following checklist will guide you through the Oracle Utilities Meter Data Management installation process. The details for each step are provided in the Oracle Utilities Meter Data Management Installation Guide.
1. Confirm recommended hardware is ready. Refer to Supported Platforms and Hardware Requirements for more details.
2. Install prerequisite software, refer to Prerequisite Software List for more details.
3. Make sure that you have downloaded Oracle Utilities Meter Data Management components.
4. Go through the installation and configuration worksheets to understand the configuration menu.
5. Determine type of the installation. For specific instructions refer to the Oracle Utilities Meter Data Management Installation Guide.
Initial Installation
Demo Installation
Upgrade Installation
6. Perform post-installation tasks.