Feeder Contingency Analysis Table
The feeder contingency analysis table contains the following columns:
Substation: The feeder's substation.
Feeder: The feeder that was analyzed for contingency analysis. This feeder represents the feeder that will have all loading transferred to adjacent feeders.
# Steps: The number of steps contained within the plan.
kVA Overload: The amount of KVA that adjacent feeders will be overloaded as a result of picking up all loading from this particular feeder.
Date: The date the analysis was last conducted.
Pickup Feeders: The feeders that will be utilized to pickup all load served by the feeder listed in the Feeder column.
Creating Switching Sheets with the Suggested Switching Solutions Tool
If you want to create a switching sheet with steps from a previously generated Suggest Switching Solutions or Feeder Contingency Analysis plan, do the following:
1. Select Suggested Switching Solutions... from the Web Workspace Tools menu.
2. Then, depending on the desired plan type to be generated, select either the Suggested Switching Solutions tab or Feeder Contingency Analysis tab.
3. Select a solution to see overview information for each plan generated for the solution.
Note: In the Suggested Switching Solutions tab, expand the tree view to see an overview of the solution details.
4. Right-click a plan name and select View Plan Details. The Suggested Switching Plan Details dialog box will open.
5. Click Create Plan to create a new switching plan.
Appending Steps to a Switching Sheet with Suggested Switching Solution
The Suggested Switching Solutions tool allows you to append steps from a previously generated Suggested Switching Solutions or Feeder Contingency Analysis plan to an existing switching sheet. With an existing switching sheet in record mode, do the following:
1. Select Suggested Switching Solution... from the Web Workspace Tools menu.
2. Then, depending on the desired plan type to be generated, select either the Suggested Switching Solutions tab or Feeder Contingency Analysis tab.
3. Select a solution to see overview information for each plan generated for the solution.
Note: In the Suggested Switching Solutions tab, expand the tree view to see an overview of the solution details.
4. Right-click a plan name and select View Plan Details. The Suggested Switching Plan Details dialog box will open.
5. Click Append Steps to append the steps to the switching sheet.