Example
For a typical project, an NCA run might be scheduled as:
• rule_value_1 = "NCA Ignore Pre-Existing Conditions (do not worsen)"
• rule_value_2 = 1 (NCA)
• rule_value_integer_1 = 6 (run at 6:00 AM each day)
• rule_value_integer_2 = 0 (start the window at midnight)
• rule_value_integer_3 = 24 (24 intervals)
• rule_value_integer_4 = 60 (intervals of 60 minutes)
• rule_value_integer_5 = 1 (ignore pre-violations but do not worsen)