Data Requirements
Model
The amount of model data required depends on the solution engine that is being utilized.
Connected kVA: Minimum data requirements. Device ratings, nominal voltages and service transformer sizes are sufficient.
kVA: Minimum data requirements. Device ratings, nominal voltages, transformer voltage levels and service transformer sizes are sufficient.
Power Flow: Full data requirements.
Future Forecasting: If future forecasting is enabled (for any solution engine type) then load profile data is required.
SCADA
FLISR requires the following from SCADA:
• Device status.
• Lockout Status (Optional). If not available it will run on time delays and device status signals.
• Fault Indications.
• Real-time load measurements.
• Pre-trip load measurements (Optional). If not available FLISR will utilize rudimentary history of the load.
• Outbound controls for device status and recloser lockout.