Creating a Strategy
When creating a strategy, you can either leave the Type as "Manual" and manually add stages as you see fit, or you can choose one of the auto-generated strategy types:
Avoided Capacity: Choose this option and a Max Demand MW field will appear. Enter a maximum MW value for the selected time period.
Load Reduction: Choose this option and a Reduction MW field will appear. Enter a MW value to reduce each hour in the selected time period.
Maximum Reduction: Choose this option to reduce as much load as possible during the selected time period.
After you select one of these types and populate the Start Time and End Time, a Generate Stages button will be enabled. Click this button to auto-generate the states according to your choices.