Construction Work Management Setup
This section lists entities related to contractor management functionality in the order they should be defined.
Level
Entity
Comment
1
1
Capital Account Flag
1
Compatible Unit Class (custom lookup)
1
2
2
2
Related Work Management Master Configuration must be configured with a Resource Type for Contractor Service.
2
Resource Types needed on overheads are meant for indirect overhead. They are used to create Other Direct Charges to account for the overhead adjustments.
2
Construction or Construction Overhead
Used to categorize activity types, identify renewal work, and defaults cost center on construction work activity if populated.
Cost Center on Service Class is typically the default Work In Progress (WIP) account.
3
3
Related Financial Master Configuration must be configured with a Reconciliation Distribution Code.
4
Prerequisites: CU Class (custom lookup)
4
Prerequisites: Country, Currency, Location Class (Lookup), Free On Board, Payment Terms, and Capability Type
5
Prerequisites: Asset Type, CU Condition (lookup), CU Account Usage (lookup), CU ID Type (lookup), Stock Item, and Stock Item Detail.
Identifies the materials, labor, and equipment necessary to install or remove assets in relationship to construction work.
6
Defines the materials, labor, and equipment necessary to install or remove assets in relationship to construction work.
7
Prerequisites: Work Design Type (lookup), Work Design Priority (lookup), Work Design Phase (lookup), Price Type (lookup), Responsibility Party (lookup), and Service Position (lookup)
8
Prerequisites: Planner, Criticality (custom lookup), Work Class (custom lookup), Work Category (custom lookup), and Work Priority (custom lookup)
8
Prerequisites: Storeroom, Asset, Project, Phase (custom lookup), Crew (as applicable), and Backlog Group (custom lookup)
9