Readiness Checklist
The following checklist provides steps to complete to install Oracle Utilities Operational Device Management. The details for each step are presented in subsequent sections.
1. Confirm that the recommended hardware is ready. Refer to Supported Platforms and Hardware Requirements for more details.
2. Install prerequisite software. Refer to the Planning the Installation section for more details.
3. Download the Oracle Utilities Work and Asset Management V2.4.0.1.1 components from Oracle Software Delivery Cloud.
4. Go through the Installation and Configuration Worksheets to understand the configuration menu.
5. Determine the type of installation then follow the instructions:
Initial Installation - For initial installation, follow the instructions in Installing Oracle Utilities Operational Device Management - Initial Installation.
Upgrade Installation - For upgrade installation, follow the instructions in Upgrading Oracle Utilities Operational Device Management
Demo Installation - For demo installation, follow the instructions in Installing Oracle Utilities Operational Device Management - Demo Installation
6. Perform post-installation tasks.
7. Install optional products as described in the Installing Optional Products section.