Readiness Checklist
The following checklist will guide you through the installation process of Oracle Utilities Smart Grid Gateway. The details for each step are presented in the Oracle Utilities Smart Grid Gateway Installation Guide.
1. Confirm recommended hardware is ready. Refer to Supported Platforms and Hardware Requirements for more details.
2. Install prerequisite software, refer to Prerequisite Software List for more details.
3. Ensure that you have downloaded Oracle Utilities Smart Grid Gateway v2.5.0.0.0 components.
4. Go through the installation and configuration worksheets to understand the configuration menu.
5. Determine type of the installation - initial, demo or upgrade. For specific instructions refer to the Oracle Utilities Smart Grid Gateway Installation Guide.
6. Perform post-installation tasks.