Readiness Checklist
The following checklist guides you through the installation process of Oracle Utilities Smart Grid Gateway. The details for each step are presented in subsequent chapters.
1. Confirm that the recommended hardware is ready. Refer to Operating Systems and Application Servers for more details.
2. Install prerequisite software. Refer to the Installing Prerequisite Software section for more details.
3. Ensure that you have downloaded the Oracle Utilities Smart Grid Gateway V2.5.0.1.1 components.
4. Go through the Installation and Configuration Worksheets to understand the configuration menu.
5. Determine the type of the installation:
Initial Installation: For initial installation follow the instructions mentioned in the Installing Oracle Utilities Smart Grid Gateway—Initial Installation.
Demo Installation: For demo installation follow the instructions mentioned in the chapter Installing Oracle Utilities Smart Grid Gateway—Demo Installation.
Upgrade Installation: For upgrade installation follow the instructions mentioned in the chapter Installing Oracle Utilities Smart Grid Gateway—Upgrade Installation.
6. Perform post-installation tasks.