1.3.2.4 Rate Revision Schedules
This topic describes about the Rate Revision Schedules.
The Rate Revision schedule details can be added for the application in the Enrichment Stage.
For information on the screen fields, refer to the field description table below.
Table 1-28 Rate Revision schedule - Field Description
| Field | Description |
|---|---|
| Min Max Rate(Range) | If the charge is based on a fixed rate, user should specify the minimum and maximum amount that can be applied on a contract. |
| Component Name | Select the component name of the rate revision schedule. |
| Frequency | Select the frequency. |
| Unit | Select the unit of frequency. |
| Start Date | Select the date on which rate revision will be applicable. |
| No Of Schedules | Select the number of schedules. |
| Reset Tenor | Select the rest tenor. The tenor will be reset to a new value. |
Parent topic: Drawdown Enrichment
