7.9.3 Specifying the Rate Revision Dates
In the OL Contract Schedules screen, select the component for which the Rate Revision frequency has to be defined (say INTEREST1). Select the Rev box (Revision box) to indicate that it is a rate revision schedule.
Then, instead of specifying the other schedule details like the frequency, the number and unit, indicate the date in the Start Date field. The rate revision is done on that date.
Example
- 12 December 1997
- 14 December 1997
- 16 December 1997
The rates applicable on the specified dates are applied on the loan at the time of calculating interest.
You can specify the frequency through this screen. To do this, you have to specify a rate revision schedule for the component (by giving the frequency and the Start Date for the first rate revision), as well as a repayment schedule, if it is to have one.
Parent topic: Revision and Repayment Schedules