1.3 Process SI Lag Maintenance
This topic provides the systematic instructions to maintain SI Cut off days, NAV Lag and Yield Lag at AMC level.
During SI maintenance, the system will apply SI Cut off days to an SI based on the AMC of the selected Fund.
If there are multiple funds for an SI (Plan level SI) with funds from different AMCs, the system will use the SI cut-off days and lags maintained in Parameter Maintenance(UTDPARAM) screen.
During DRSP yield computation, the system uses the NAV Lag and Yield Lag maintained for the fund’s AMC.
If SI cut-off, NAV lag and Yield Lag are not maintained for an AMC in SL Lag Maintenance screen, then the system will use SI Cut off days and lags maintained in Parameter Maintenance(UTDPARAM) screen
In case of Plan level SI, if all funds belong to same AMC, and if SI cut-off and lags for this AMC is maintained to use Fund Calendar, the system will use the AMC level maintenance as follows:
For SI cut-off, the system will use the least date from the derived cut-off date for each fund.
For instance, if SI date is 28-May and cut-off for Fund A is 21-May and cut off for Fund B is 20-May depending on the fund holidays, then the system will consider the cut off day for this SI as 20-May.
Yield computation date for each fund under an SI may not be same.
For instance, if there are 2 Funds, Fund A and Fund B for an SI with SI generation date as 28-May. If yield computation date for Fund A is 24-May and Yield computation date for Fund B is 25-May, then the system will compute yield and decide the SI generation amount for Fund A and Fund B on 24-May and 25-May respectively. Total amount for the SI can be determined only after 25-May when yield computation is completed for both the funds.
The system will calculate the NAV Date for yield computation for each fund based on the fund calendar and NAV Lag maintained.
Note:
The SI Lag Maintenance is applicable only for Fund Manager.Parent topic: Maintain Standing Instructions