14.6.2.4.1.1.1 SCD (Slowly Changing Dimensions)

Note:

If you have entered the Full Load parameter as YES, you can load snapshot data for master tables and execute SCD process with additional parameters.

In case, when you have entered the Full Load parameter as YES and if the load is incremental and does not contain all the nodes, those nodes are retired by default.

When entered as NO, you can load incremental data for master tables and execute SCD process with additional parameters. The incremental data load for master tables is supported.

The retired dimensions can be brought back as part of subsequent SCD load by updating the Closed Flag column to null or 'N'.

Current behavior of Disabled Nodes:
  • The Closed Flag attribute is not supported for the Product Processor (PP) accounts.
  • A new node in the Stage Master table with Closed Flag 'Y' is supported and will be ignored during SCD load.

To configure this widget, complete the following steps:

  1. On the Process Flow page, from the LHS menu, expand Widget and drag and drop this widget on to the canvas.
  2. Double-click the widget on the canvas. The configuration window is displayed with the Activity tab selected.
  3. Under Dynamic Parameters, configure the settings described in the following table.
  4. Click the tick mark icon to save your changes. To close the configuration window, click anywhere outside the window on the canvas.

Table 14-5 Dynamic Parameters for SCD Description

Property Description
Datastore Name

Refers to the name of the Information Domain.

By default, the Information Domain to which you are connected is selected.

Name Select the name of the required dimension table.
Full Load No input required.
Execution Venue

No input required.

Effective Date

No input required.