8.2.9.2 Module Usage

Premium and Discount Instruments use this field to indicate the method to amortize/accrete. Values are 0=Level Yield, 1=Straight Line. This input is read by the Cash Flow Engine when the DEFERRED_CUR_BAL is > 0. See Deferred Current Balance (DEFERRED_CUR_BAL) for a description of the Level Yield calculation.