5.1.1.3 Transition
The Transition component is used to control the flow between various components in the Process Flow. Transition connects two activities and the flow is configured based on a Conditional Expression or Decision Rule.
To configure Transition details, follow these steps:
- Click the Transition tab.
- Click the + icon to display the Add New Transition from Node window.
- Select the required job to be connected to from the Connected To drop-down.
- Enter a name for the transition in the Transition Name field.
- Enter the order of execution in the Order field. For example, 1 marks the order as to be executed first.
- Click the Search icon from the Decision Rule drop-down and select the required application rule.
- Depending on the Execution Type, enter the required details.
- Click the check mark icon to save the details.
- Select the stroke format from the Stroke drop-down.
- After entering the details, click the check mark icon to save the entered details.