8.1.2 Executing the Dimension Loader

Load the dimension data required for runchart execution and verify that all dimension-loader tasks complete successfully.

After uploading the dimension input files, use the DIM_LOADER batch to load dimension data for the required MIS date. All three tasks must complete successfully before you continue with the remaining runchart prerequisites.

  1. After uploading the dimension files, select DIM_LOADER.
  2. Confirm the task configuration:

    Table 8-2 Dimension Loader Tasks and Loader Types

    Task Loader Type
    STG_DIM Stage Dimension Loader
    STG_DRM Stage DRM Loader
    STG_HIER Stage Hierarchy Loader
  3. Execute the batch for the required MIS date.
  4. Confirm all three tasks complete successfully. Resolve failures before continuing.