8.2.3 Rejecting Reports from E-Files
Use this pane to reject reports from an E-File. Only those reports, which are in E-File Generated and Acknowledgment - Rejected Summary can be rejected. After the report is rejected from an E-File, it is removed from the E-File Reports list and the Summary of the report changes to Rejected from E-File. The rejected report is available in the Regulatory Reports List.
You can correct a rejected report and resubmit for Supervisor’s approval. After the
corrected report is approved, you can follow the workflow of filing a regulatory report
all over again as explained earlier.
Note:
After an E-File has been uploaded and accepted by the AUSTRAC System, The Supervisor must not reject the reports from the E-File until the acknowledgment file is uploaded to the OFS RR AUS SMR application. If you reject a report after submission but before processing the acknowledgment files there will be a mismatch in the files referred in the acknowledgment file and the current E-File. If a report is rejected before uploading the acknowledgment into the OFS RR AUS SMR application, then you have to re- submit the E-File at the AUSTRAC System to get the latest acknowledgment file.To reject reports from an E-File, follow these steps: